Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 14, 2025 at 7:00 PM
Updated February 15, 2025
Site work for a municipal facility in Mattawa, Washington. Completed plans call for site work for a municipal facility.
Priest Rapids Hatchery Raceway Bird Deterrence Cable Project Clarification Deadline 2/4/2025 12:00 AM The site is located at 29086 Highway 243 S. Mattawa, WA 99349. The Contractor shall furnish all materials, equipment, machinery, tools, plant, labor, and transportation to perform the work specified in these Contract Documents for the Priest Rapids Hatchery Raceway Bird Deterrence Cable Project located at Priest Rapids Hatchery located at the Priest Rapids Dam, 29086 Highway 243 S, Mattawa, Washington. The Priest Rapids Hatchery is located at the Priest Rapids Dam in Mattawa WA. Priest is a Fall Chinook hatchery. There are five raceway ponds located at the hatchery. The ponds are labeled A thru E. Each pond has a steel support frame that is bolted together. The frame supports the bird deterrent netting. The frames have become loose from the wind. Each pond, A thru E needs to have the bolts connecting the frame tightened up before the netting can be installed. Additionally, after the frame is tightened up a new bird deterrence cable system will need to be installed onto Pond A. Specific Work to be Performed - Each pond's framework has 250-300 5/8" bolt and nuts that will need to be fully tightened. The threads on each bolt will need to be scoured after tightening or a form of thread locker needs to be applied to keep nuts from backing back out. The use of some sort of boom truck may be needed to perform the work and lift a manlift into the raceways to and to access the interior framework. After all the frames have been tightened up Pond A will have a new bird deterrence cable system installed. The cable consists of a 3/32" uncoated stainless-steel cable. The cable will have a 7 1/2" spacing spanning north to south across the raceway. The cables will be connected to the frame using a fabricated steel bracket, aluminum cable crimps, stainless thimbles, and springs. All work needs to be completed before fish are ponded. See estimated planting dates for estimated times (SR-2.A ).
Bid Results
Municipal
$49,500.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2025
March 14, 2025
29086 Hwy 243 S, Mattawa, WA
Related To This Project
Mattawa, WA
Bid Date: May 08 2025
Mattawa, WA
Bid Date: Apr 22 2025
Mattawa, WA
Bid Date: Jul 02 2025
Mattawa, WA
Bid Date: Jul 02 2025
Mattawa, WA
Bid Date: Aug 29 2025
Mattawa, WA
Bid Date: Aug 04 2025
Mattawa, WA
Bid Date: Sep 16 2025
Mattawa, WA
Bid Date: Oct 01 2024
Mattawa, WA
Bid Date: Sep 25 2024
Mattawa, WA
Bid Date: Sep 06 2024
Mattawa, WA
Bid Date: Apr 10 2024
Mattawa, WA
Bid Date: Apr 10 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
