BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 14, 2025 at 7:00 PM

Updated February 15, 2025

Site work and paving for a sidewalk / parking lot in Pasadena, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work consists of removal and replacement of sidewalk and miscellaneous appurtenant work. Question Deadline 01/31/2025 at 10:00 AM PT Questions must be submitted via the City's eProcurement Portal Time is of the essence in the performance of the work. The CONTRACTOR shall begin work within fifteen (15) calendar days after date of the Notice to Proceed and shall diligently prosecute the work to completion in every detail, within 40 Working Days after the date in the Notice to Proceed with Work, exclusive of maintenance periods if any. In accordance with Section 6-9 of the Standard Specifications, for each consecutive calendar day required to complete the work in excess of the time specified herein for its completion, as adjusted in accordance with Section 6-6 of the Standard Specifications, the Contractor shall pay to the City, or have withheld from monies due it, the sum of $1,500 per calendar day. The bond must meet the following requirements and characteristics: Bid security in the amount of five percent (5%) of the total bid price in the form of a redeemable or callable electronic surety bond, meeting City requirements, must accompany all bids. If the Bidder to whom the contract is awarded shall for fifteen (15) calendar days after such award fail or neglect to enter into the contract with the required insurance documentation, submit the Construction & Demolition Waste Management Plan, and file the required bonds, the City may deposit in its treasury said bid security and, under no circumstances, shall it be returned to the defaulting Bidder. Failure to return signed contract with all the attachments stated above may result in having the project awarded to the next lowest bidder The Material and Labor Bond and the Faithful Performance Bond shall be for one-hundred percent (100%) of the contract amount consisting of the base bid stated in the Bidder's Proposal. The City reserves the right to reject as nonresponsive any bid that fails to include the information required by any addendum(a) posted on the City's website. The Bidder is required to acknowledge all addenda received in Bidder's Proposal. Engineers estimate $200k - $240k

Bid Results

Sidewalks / Parking Lot

$164,500.00

Public - City

Paving, Site Work

3

6

5

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
551
Active Projects
204
Bidding Soon
3,778
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

March 14, 2025

Project location map

Multiple Locations, Pasadena, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.