BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 7, 2025 at 7:00 PM

Updated March 8, 2025

Site work for a water / sewer project in Missoula, Montana. Completed plans call for site work for a water / sewer project.

Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the City of Missoula , in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Construction Performance Bond and a Construction (Labor and Materials) Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. The right is reserved to reject any or all Proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days , and to accept the lowest responsive and responsible bid which is in the best interest of the City of Missoula. This project consists of the following, but is not necessarily limited to: installing approximately 2610 linear feet of 8-inch and 119 linear feet of 6-inch water mains located underneath Milton Street from Defoe to Howell, on Howell Street from the railroad to Holmes, on Holmes Street from Howell to Phillips, on Phillips Street from the railroad to Worden and on Sherwood from Mitchell to Worden in Missoula, MT. The existing water services will be swapped and connected to the new mains. Associated appurtenances, fittings and restoration necessary to complete the project are detailed in the construction plans. This work includes the furnishing and installation of equipment, materials and related appurtenances in the following trades: piping, concrete, landscaping, paving and other related trades. The work will be done under a single contract. Final questions are due Friday January 31, 2025 by 12 pm, final addendum will be issued Friday January 31, 2025 at 5 pm. Milton/Howell/Phillips Water System Improvements1. +/- 2,600 LF of 8-inch Ductile Iron CL 350 Water Main, 5 Fire Hydrants, 5 Water Main Connections, 80 Water Service Line Connections, 1 Temporary 2-inch Water Main Connection B. North 1 st Street Water System Improvements 1. +/- 1,300 LF of 8-inch Ductile Iron CL 350 Water Main, 4 Fire Hydrants, 2 Water Main Connections, 31 Water Service Line Connections C. General Scope All Projects 1. Installation of new ductile iron water main 2. Connection to existing water mains 3. Reconnection of existing water service lines and appurtenances 4. Installation of new valves, fittings and fire hydrant 5. Asphalt trench repair 6. Utility crossings 7. Restoration of public rights-of-way and private lawns 8. Traffic Control

Bid Results

Water / Sewer

$1,162,588.00

Public - City

Site Work

23

22

7

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
4
Bidding Soon
85
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2025

March 7, 2025

Project location map

Multiple Locations, Missoula, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.