Published March 7, 2025 at 7:00 PM
Updated March 8, 2025
Site work for a water / sewer project in Missoula, Montana. Completed plans call for site work for a water / sewer project.
Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to the City of Missoula , in an amount not less than ten percent (10%) of the total amount of the bid. Successful BIDDERS shall furnish an approved Construction Performance Bond and a Construction (Labor and Materials) Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided. The right is reserved to reject any or all Proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed sixty (60) days , and to accept the lowest responsive and responsible bid which is in the best interest of the City of Missoula. This project consists of the following, but is not necessarily limited to: installing approximately 2610 linear feet of 8-inch and 119 linear feet of 6-inch water mains located underneath Milton Street from Defoe to Howell, on Howell Street from the railroad to Holmes, on Holmes Street from Howell to Phillips, on Phillips Street from the railroad to Worden and on Sherwood from Mitchell to Worden in Missoula, MT. The existing water services will be swapped and connected to the new mains. Associated appurtenances, fittings and restoration necessary to complete the project are detailed in the construction plans. This work includes the furnishing and installation of equipment, materials and related appurtenances in the following trades: piping, concrete, landscaping, paving and other related trades. The work will be done under a single contract. Final questions are due Friday January 31, 2025 by 12 pm, final addendum will be issued Friday January 31, 2025 at 5 pm. Milton/Howell/Phillips Water System Improvements1. +/- 2,600 LF of 8-inch Ductile Iron CL 350 Water Main, 5 Fire Hydrants, 5 Water Main Connections, 80 Water Service Line Connections, 1 Temporary 2-inch Water Main Connection B. North 1 st Street Water System Improvements 1. +/- 1,300 LF of 8-inch Ductile Iron CL 350 Water Main, 4 Fire Hydrants, 2 Water Main Connections, 31 Water Service Line Connections C. General Scope All Projects 1. Installation of new ductile iron water main 2. Connection to existing water mains 3. Reconnection of existing water service lines and appurtenances 4. Installation of new valves, fittings and fire hydrant 5. Asphalt trench repair 6. Utility crossings 7. Restoration of public rights-of-way and private lawns 8. Traffic Control
Bid Results
Water / Sewer
$1,162,588.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2025
March 7, 2025
Multiple Locations, Missoula, MT
Related To This Project
Missoula, MT
Bid Date: Apr 29 2025
Missoula, MT
Bid Date: Feb 19 2025
Missoula, MT
Bid Date: Mar 06 2025
Missoula, MT
Bid Date: Feb 20 2025
Missoula, MT
Bid Date: Mar 04 2025
Missoula, MT
Bid Date: Mar 06 2025
Missoula, MT
Bid Date: Apr 02 2025
Missoula, MT
Bid Date: Mar 13 2025
Missoula, MT
Bid Date: Feb 05 2025
Missoula, MT
Bid Date: Feb 27 2025
Missoula, MT
Bid Date: Jan 17 2025
Missoula, MT
Bid Date: Jan 21 2025
Missoula, MT
Bid Date: Jan 16 2025
Missoula, MT
Bid Date: Jan 15 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.