BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Site work and paving for a mixed-use development in Canton, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

High Friction Surface Treatment Vendors Questions Submitted via email to kelly.pendley@cantonga.gov February 11, 2025 Vendor Questions Answered via email and Addendum Posted on Website by 4:00pm February 13, 2025 The time allowed for substantial completion is 120 days, and the time allowed for completion and readiness for final payment is 150 days from the date a notice to proceed is issued by the City of Canton. The vendor shall provide licensed, qualified personnel to add a High friction surface treatment according to the specifications and conditions: **Please note that this project is in conjunction with our yearly road resurfacing RFP. The timeline of completion to add the High Friction Surface treatment will be aligned with road resurfacing for both Laurel Canyon Parkway and Great Sky Parkway. A. Laurel Canyon Parkway o Furnish and install high friction surface treatment as per the GDOT Specification 419 o Furnish and install thermoplastic double yellow line. B. Great Sky Parkway o Furnish and install high friction surface treatment as per the GDOT Specification 419 o Furnish and install thermoplastic double yellow line. Additionally: The construction includes, but not limited, to the following: o Furnishing all: materials (unless specifically stated otherwise), equipment, and labor necessary to construct the project. Representatives from the City of Canton will perform construction inspections of the work and will approve work progress as defined in the scope of work. o Material testing will be the responsibility of the Contractor and upon completion a letter certifying that the project meets required placement and compaction standards shall be required by the contractor. City and GDOT specifications apply. o Street shall be striped to match existing location and arrangement using thermoplastic pavement markings. Striping must be completed within 2 weeks of final overlay. This policy is strictly enforced. The Owner reserves the right to reject any or all bids, to waive informalities and re-advertise.

Bid Results

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
217
Bidding Soon
2,314
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2025

March 20, 2025

Project location map

Multiple Locations, Canton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.