BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Fayette, New York. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

CR Number: 2121667 The DBE goal for this project is 6%. There are no M/WBE goals for this project. The EEO Employment goals for this project are: 5.9% Minority Employment Goal 6.9% Women Employment Goal The use of the NYSDOT approved civil rights reporting software, Equitable Business Opportunities (EBO), is required. Access authorization to EBO can be found The successful Bidder will be required to comply with all provisions of the Federal Government Equal Employment Opportunity clauses issued by the Secretary of Labor on May 2, 1968, and published in the Federal Register (41 CFR Part 60-1, 33 F.2 7804). The successful Bidder will be required to pay prevailing wage rates on this Contract. All bids must include the materials in Division 00 03 and 00 04. This is a unit price bid as described in the Information For Bidders. No Bidder may withdraw his/her bid within forty-five (45) calendar days after the actual date of the opening thereof All work items of the Contract shall be substantially completed 90 calendar days from mobilization of the site unless such a period is extended by the Owner as provided herein. All work shall be substantially completed no later than August 1, 2026. Substantial completion is defined by the complete installation of all items in the Contract and the road opened to traffic, with the exception of minor grading and seeding. The Bidder to whom the Contract is awarded will be required to furnish Performance, Payment and Guarantee Bonds from an acceptable Surety Company for an amount not less than 100% of the accepted bid. The successful Bidder and all subcontractors must have an approved CCA-2 on file with NYSDOT prior to being awarded a contract. If the successful Bidder does not currently have a CCA-2 on file with NYSDOT, the Bidder may find the CCA-2 forms and instruction for completion online. Question Deadline 05/06/2025 Questions regarding the Contract Documents should be directed to Jonathan M. Walczak, P.E., Barton & Loguidice, D.P.C. either through email at: jwalczak@bartonandloguidice.com or by telephone at (585) 325-7190. Bidders shall promptly notify Jonathan Walczak of any errors, omissions, conflicts or ambiguity within the Contract Documents within 7 days of bid opening. The Owner is Seneca County and the work site is located in the Town of Fayette, Seneca County New York. The projects limits extend from: 100 feet west of the existing bridge to 225 feet east of the existing bridge. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion of the work shown on the Plans and described in these Specifications including, but not necessarily limited to the following: 1. Bridge rehabilitation project that will completely replace the existing superstructure with steel girders and a cast-in-place concrete deck. 2. Minor substructure work including new backwalls, wingwall caps, and reconstructed bridge seats. One wingwall will be stabilized using tie-back rods to a cast-in-place concrete deadman. 3. Approach work includes new approach slabs and 210 feet of asphalt full-depth reconstruction. 4. Installation of new bridge and roadway guide railing 5. Maintenance of an off-site detour for the duration of construction. Document description Seneca County Office Building 1 Dipronio Drive Waterloo, New York 13165 Barton & Loguidice, D.P.C., 11 Centre Park Suite 203 Rochester, NY 14614 No questions or inquiries regarding this Bid will be accepted within seven (7) business days prior to the Bid opening. All bids must include the materials in Division 00 03 and 00 04. This is a unit price bid as described in the Information For Bidders. No Bidder may withdraw his/her bid within forty-five (45) calendar days after the actual date of the opening thereof. Each bid must be accompanied by security in an amount not less than five percent (5%) of the amount of the bid in the form and subject to the conditions provided in the Information For Bidders. All work items of the Contract shall be substantially completed 90 calendar days from mobilization of the site unless such a period is extended by the Owner as provided herein. All work shall be substantially completed no later than August 1, 2026. Substantial completion is defined by the complete installation of all items in the Contract and the road opened to traffic, with the exception of minor grading and seeding.

Bid Results

Bridges / Tunnels

$841,697.00

Public - County

Demolition, New Construction, Paving, Site Work

39

8

2

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
152
Bidding Soon
1,579
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

June 16, 2025

Project location map

Marshall Rd, Fayette, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.