BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2025 at 8:00 PM

Updated March 14, 2025

Site work and paving for a road / highway in Cherry Hills Village, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2025 City of Cherry Hills Village Mill and Overlay/HIP Asphalt Project Reference Number 0000373863 Job Location: City Wide 1.) Colorado Blvd (Hampden to Quincy Avenue): 2" mill/overlay or HIP Asphalt Recycling. 2.) South Holly Street (Quincy Avenue to Belleview Avenue): 2" mill/overlay or HIP Aspahlt Recycling. 3.) Sedgwick Drive: 2" mill/Overly or HIP Asphalt Recycling. Project will include all traffic control, resident notification, street striping and thermoplastic needs. The contractor will need to provide all traffic control (flaggers, signage, cones, ultra panels, etc.) throughout the entire project. The City of Cherry Hills Village does not recognize traffic control or mobilization, re-mobilization, or de-mobilization as a separate line item. In addition, the contractor will need to provide material testing pertaining to material specs and compaction. Question Deadline 02/27/2025 at 12:00 PM MT Questions are submitted online No All questions regarding the meaning or intent of the Contract Documents shall be submitted in writing to Ralph Mason, Project Manager, City of Cherry Hills Village, 2450 East Quincy Avenue, Cherry Hills Village, CO 80113. Buyer Preferences, Guidelines & Requirements General Requirements - Installation Required - Insurance Required - Samples Required - Warranty Information Required Bonding Requirements - Bid Bond 10 % The successful Bidder will be required to furnish, as part of the Contract, insurance certificates in the amount specified in the General Conditions, a Performance, Payment, Maintenance and Warranty Bond in an amount equal to one-hundred percent (100%) of the Contract Sum, said bond to be issued by a responsible corporate surety approved by the City, and which shall guarantee the faithful performance of the Construction Contract and the terms and conditions therein contained and shall guarantee the prompt payment of all materials and labor, and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor. Each Bid shall be made on the Form of Bid provided in the bid packet and no Bidder may withdraw his Bid for a period of ninety (90) days from and after the date set for opening of bids. The City reserves the right to waive informalities or irregularities and to reject any or all Bids. Capitalized terms have the meaning assigned in the General Conditions.

Bid Results

Roads / Highways

$730,575.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
0
Bidding Soon
819
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

April 7, 2025

Project location map

Multiple Locations, Cherry Hills Village, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.