BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2025 at 8:00 PM

Updated March 12, 2025

Site work for a playground / park / athletic field in Pewaukee, Wisconsin. Completed plans call for site work for a playground / park / athletic field.

The City of Pewaukee Parks and Recreation Department is accepting proposals for the ball diamond backstop fence replacement at Balmer Park (N44W23875 Lindsay Rd). Work to be completed prior to April 14, 2025. 1. Replace Backstop • Furnish and install 90’ of galvanized chain link fence. Fence to be 30’ high overall and located 20’ behind home plate: o Dimensions to be 20’ behind home plate x 30’ high with one 35’ wide by 30’ high wing towards each foul line. o 2” mesh #6-gauge galvanized steel for bottom 12’ height of 20’ width behind home plate and 2” mesh #9-gauge galvanized steel for top 18’. o Posts for the backstop should be 4” diameter. o Horizontal rails (1 5/8”) to be at base, 6’, 12’, 18’, 24’, 30’. ? Additional horizontal rail at ~3’ height on backstop behind home plate only (20’). o All posts will be set in 12”x60” deep concrete footings for frost protection and spaced 10’ on center maximum. • Excavated spoils will be hauled away. 2. Replace Infield Fence & Dugout • Furnish and install 192’ of galvanized Chain Link Fence, including top and bottom rail @ 1 5/8”. Fence to be 8’ high overall. o 2 of 8’ high x 70’ long (140’ total), one towards each foul line. o 2 of 8’ high x 20’ long (40’ total) on each foul line to create dugout (see drawing). o 2 of 8’ high x 6’ long (12’ total) on each foul line to enclose 3 rd side of dugout (see drawing). o 2 ½-3” line posts, spaced a maximum 10’ on center. • Posts to be driven down a minimum of 4’. • Excavated spoils will be hauled away. 3. Facility Information • This facility is a high use baseball diamond. Infield material is not to be disturbed by fence installation. Alternate Bids – Please provide these alternative bid prices: • (2A) Fence to be 6’ high overall. • Existing fence to be taken down by vendor.

Award

Playgrounds / Parks / Athletic Fields

$25,950.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
362
Active Projects
203
Bidding Soon
2,011
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 10, 2025

Project location map

N44W23875 Lindsay Rd, Pewaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.