BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Renovation of a mixed-use development in Thorne Bay, Alaska. Completed plans call for the renovation of a educational facility.

Southeast Island School District invites sealed proposals for the supply, delivery, and installation of school doors at the Thorne Bay Gym, Thorne Bay School, Barry Craig Stewart Kasaan School, and Whale Pass School. Project Requirements Thorne Bay Gym and Thorne Bay School (Total 7 Doors) 1. Pairs of Hollow Metal Doors with Frames: Vision kit with insulated clear glass (top and bottom). 2. VonDuprin Rim Panic Devices. 3. Stainless Steel Kick Plates installed at 8": Inside and outside. 4. EL Strikes. 5. FULL Length Hinges. SISD Door Replacement RFP 1/23/2025 Page 1 of 10 6. Seal Kits: Threshold, sweeps, smoke seals. 7. Hard Seals. 8. LCN Closers. 9. VonDuprin Pull Trims: With BEST ACCESS IC cores and keys. 10. Removable Mullions: With BEST ACCESS IC cores and keys. Barry Craig Stewart Kasaan School (Total 2 Doors) and Whale Pass School (Total 4 Doors) 1. Single Hollow Metal Door with Frame: Vision kit with insulated clear glass (top and bottom). 2. VonDuprin Rim Panic Devices. 3. Stainless Steel Kick Plates: Inside and outside. 4. EL Strikes. 5. FULL Length Hinges. 6. Seal Kits: Threshold, sweeps, smoke seals. 7. Hard Seals. 8. LCN Closers. 9. VonDuprin Pull Trims: With BEST ACCESS IC cores and keys. Additional Parts for Future Repairs 1. Four (4) extra pieces of glass. 2. Two (2) extra panic devices. 3. Two (2) extra closers. 4. Two (2) extra doors. III. Scope of Work 1. Final Measurements: Contractor to take final measurements to ensure fitment accuracy. 2. Removal of Old Doors and Frames. 3. Supply and Installation: New doors and frames per requirements listed above. 4. Shipping: Delivery of all materials to Thorne Bay, Alaska. IV. Specifications Material Finish: Brushed Chrome, Stainless, or Aluminum. Product Life Expectancy: Minimum of 30 years in a marine environment. Equivalent Products: Equivalent products may be used if they meet or exceed the specifications. Please refer to the Appendix A for further details and specifications.

Award

Educational

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
17
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2025

June 9, 2025

Project location map

Multiple Locations, Thorne Bay, AK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.