BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2025 at 7:00 PM

Updated February 21, 2025

Site work and paving for a road / highway in Clarendon Hills, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2025 Paving Work at the Lane Elementary School and Prospect Elementary School. Each bid must be accompanied by a Bid Guarantee in the form of a Bid Bond, Certified Check or Bank Draft in an amount equal to not less than ten percent (10%), of the bid and made payable to Community Consolidated School District 181, 115 West 55th Street, Clarendon Hills, DuPage County, Illinois. No bid shall be withdrawn for a period of thirty (30) days after the bids opening date without the consent of the Owner. Checks or drafts of unsuccessful bidders will be returned as soon as practical after opening and checking the bids. Successful bidder must provide a Performance Bond and a Labor and Material Payment Bond in the full amount of the Contract, acceptable to the Owner. The Owner reserves the right to reject any or all bids and to waive any informalities in bidding. SCOPE OF WORK A. Work included under this section shall include but not necessarily be limited to the following: 1. Perform demolition work as necessary to accomplish the work, including the removal and proper disposal of items which are exposed and not to remain in use, including but not necessarily limited to pavement, walks, plantings, plumbing, mechanical and electrical items, etc. 2. Include items exposed such as sewer, water and electrical lines which may require capping per city or utility company requirements. 3. Properly dispose of demolished material and such other obstacles required for a complete and proper installation of new work and the disposition of materials incidental to this work. 4. Erection of barricades, etc., to protect existing building areas. 5. Protection of existing utilities. 6. Repair to building areas, utilities damaged during demolition. 7. Demolition in specific building locations to the extent described on the drawings and/or required to construct the work shown. 8. Remove protection when work is complete. 9. Rubbish and debris shall be promptly removed from building as to minimize dust within the building. 10. Coordinate with Owner Operations. Portions of the school building will be in operation during the construction phase. B. Existing surfaces and finishes which are marred or defaced as a result of demolition work shall be patched and matched as required. C. Demolition shall include the removal of debris materials associated with demolition procedures. Debris shall be properly deposed of into project dumpsters and subsequently taken to a legal dump site.

Award

Roads / Highways

$130,708.00

Public - County

Paving, Site Work

9

10

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
442
Active Projects
242
Bidding Soon
3,261
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2025

March 10, 2025

Project location map

Multiple Locations, Clarendon Hills, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.