BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 3, 2025 at 7:00 PM

Updated February 4, 2025

Site work and paving for a road / highway in Walla Walla, Washington. Design plans call for site work for a road / highway.

Since 2003, WSDOT and the US Highway 12 Coalition have made significant progress towards widening US 12 from two to four lanes between the Snake River (near Burbank) to Walla Walla. Phase 8 will complete the approximately 10 miles of new four-lane divided highway that remain between Packaging Corporation of America and Nine Mile Hill. As of February 3, 2025, this project is in the right of way phase. Design is being done in house. Construction bidding is expected to take place in the summer of 2027.

Design

Roads / Highways

$351,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
28
Bidding Soon
270
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2027

Project location map

Multiple Locations, Walla Walla, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.