BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 12, 2025

Site work and paving for a bridge / tunnel in Butler, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of June 10, 2025, the project was awarded to but the awarded amount is not available.** Monroe Street Bridge Deck Repairs Project The project will include: Concrete repairs, including but not limited to, structural concrete repairs, membrane coating replacement and caulk sealant replacement to the South Monroe Street Bridge in the City of Butler. Any and all mobilization, General Condition requirements, dust control, pedestrian and vehicular traffic control, notifications, temporary facilities, temporarily relocating electrical items, safety equipment, site photography, project management, and restoration of disturbed areas shall be considered incidental to this Contract. This is a unit price contract. Pennsylvania prevailing wage rates apply to this contract Performance and Labor and Material Payment Bonds or certified check in the amount of 100% of the contract, along with Public Liability and Property Damage Certificates of Insurance in the amounts specified, as well as Certificates of Workman's Compensation must be filed with the executed Agreement Proposals to receive consideration must be accompanied by a Certified Check or Bidder's Bond from a Surety Company authorized to do business in Pennsylvania, made to the order ofthe City of Butler in an amount equal to ten percent (10%) of the total amount of the Proposal as a guarantee that, if the Proposal is accepted, the successful Bidder will enter into an Agreement within 15 days after Notice of the Award of the Contract. The Proposals shall remain firm for a period of sixty (60) days. No Bidder may withdraw his Proposal during the sixty (60) day period without forfeiting his Bid guarantee. The City of Butler reserves the right to reject any or all Proposals, or any part thereof, for any reason, and also reserves the right to waive any informality therein.

Award

Bridges / Tunnels

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
111
Bidding Soon
1,665
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2025

July 1, 2025

Project location map

S Monroe St, Butler, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.