Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 12, 2025 at 8:00 PM
Updated March 14, 2025
Site work and paving for a mixed-use development in Greenville, South Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
The County of Greenville is requesting quotes for the demolition and removal of all structures and debris at 20 Arch Street Extention, Greenville, SC 29617. GENERAL REQUIREMENTS Demolition (raze/ tear down) of all structure(s), to include removal of the structure(s), removal of all debris, weeds, rank vegetation, driveways, slabs, foundation walls, impervious surfaces, and fences. Sever and seal electrical, gas, water, sewer, and telephone utility mains per the Utility Companies Directives, also to fill open wells, removal/crushing/fill-in of septic tanks, underground fuel tanks, etc. on property(ies) to South Carolina Department of Health and Environmental Control standards. Demolition of the structure shall be in accordance with all applicable regulations for the properties located at: 20 Arch Street Extension, Greenville, SC Tax Map Number 0236.00-06-043.00. The structure has experienced two fires over the last year, with the most recent occurring on January 21, 2025. Asbestos WAS detected on the property. Project design and air monitoring will be required for asbestos abatement. Greenville County has contracted with S&ME for project design and air monitoring services. Coordination with S&ME and Greenville County Codes is required to conduct the air monitoring during the abatement. Due to extensive damage and joint compound contamination from the fires, S&ME advises the entire structure be demolished as an "ACM in Place" demolition, with the asbestos remaining in place, as constructing containment inside is not feasible. GIS Map, S&ME Asbestos Abatement Specifications, and S&ME Asbestos Assessment are attached. Where air monitoring is required, the contractor must notify the Greenville County Code Compliance representative of the date the abatement contractor will be on site to have air monitoring in place. Ample notice must be given in order to arrange the services. Leveling and grading of entire site and seeding the property with a mixture of grass seed, specifications found in Section G "CLEAN-UP" of this document. Construction of any temporary passageways meeting the requirements of these specifications may be required Question Deadline 02/05/2025 at 5:00 PM ET
Post-Bid
Roads / Highways
$100,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 13, 2025
March 17, 2025
20 Arch St Ext, Greenville, SC
Related To This Project
Greenville, SC
Bid Date: Feb 17 2025
Greenville, SC
Bid Date: Feb 20 2025
Greenville, SC
--
Greenville, SC
Bid Date: Feb 26 2025
Greenville, SC
Bid Date: Mar 04 2025
Greenville, SC
Bid Date: Mar 04 2025
Greenville, SC
Bid Date: Mar 06 2025
Greenville, SC
Bid Date: Mar 11 2025
Greenville, SC
Bid Date: Feb 21 2025
Greenville, SC
Bid Date: Feb 14 2025
Greenville, SC
Bid Date: Feb 05 2025
Greenville, SC
Bid Date: Feb 20 2025
Greenville, SC
Bid Date: Feb 06 2025
Greenville, SC
Bid Date: Feb 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
