Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2025 at 7:00 PM
Updated February 28, 2025
Demolition and site work for a mixed-use development in Goldsboro, North Carolina. Completed plans call for the demolition of a multi-residential development; for site work for a multi-residential development; residential development; and residential development.
For the furnishing of labor, material and equipment entering into the Project. Scope of work will consist of demolition of existing buildings and includes, but is not limited to, the following items: 1. Provide all labor, materials and equipment required to demolish and remove One (1) existing building Group of Four (4) sub-buildings, Sixteen (16) apartments, multi-family, residential buildings identified on the plans, complete. 2. Provide all labor, materials and equipment required to selectively demolish and remove existing site infrastructure and development identified on the plans. 3. Provide all labor, materials, and equipment required to provide fill, seed and straw where foundations are removed and all other voids in earth are created due to demolition and removal of existing construction. 4. Provide all labor, materials, and equipment required to stabilize areas of demolition and provide new construction as identified on the plans. 5. Provide all other work as shown on the plans, in the project manual and as required by codes and the authority having jurisdiction (AHJ). 6. Salvage: The Owner may wish to salvage minor items such as newer appliances, doors, etc. for use on units not being demolished at this time. The intent is that the Owner willsalvage items between the time for resident move out but before the apartment is turned over to the Contractor. 7. Contractor to limit vehicles on the grass (some of the pipes are shallow and have been damaged in past by vehicles on yard areas). Contractor is responsible for providing a temporary security chain link fence around the building during the demolition operations. 8. The electrical distribution system is owned by the Owner. The owner will have East Coast Power & Lighting disconnect the power to the building(s) scheduled to be demolished. The Owner will disconnect the power at the transformer and the building(s); the site pole lights shall have the power remained connected for the site lighting; note that the plans denote some sight lighting that is fed underground, verify that any in the construction area have the power disconnected prior to demolition. East Coast Power & Lighting has a service contract with the Owner for maintenance and service of the electrical distribution system at Fairview. 9. Underground utilities shall be disconnected and removed, cap at location noted or behind the street curb (water & sewer, phone, cable tv). The gas company shall be responsible for removal of gassystem from the meter back to the gas main. 10. As part of Base Bid, Contractor shall provide suitable fill and top soil to bring any depressions as a result of demolition back up to existing grades, compact to 85%. The intent is to not leave site with low areas that hold water, grade to drain and establish grass. 11. A project superintendent must be on site at all times any work associated with this contract is being performed. The Project Superintendent will provide overall project oversight, providing guidance and assistance to its Sub Contractors. 12. Contractors shall review Separate Report provided by Owner regarding Hazardous Materials Assessments. It is believed that the Building(s) contain Asbestos and Lead Based Paint. Contractor shall follow State and Federal Guidelines in handling Hazardous Materials. 13. Contractor shall contract with an Environmental Consultant to prepare an Asbestos Removal Plan. The Contractor's Environmental Consultant will be responsible for clearance testing and reporting. Removal plans shall be prepared to comply with local, state and federal requirements. Clearance testing and reports shall be promptly performed and prepared to be submitted for permitting. Permits and Acceptance: o All Permit requirements shall be coordinated with the City of Goldsboro Inspections, Fire Department and Engineering Departments and PWC. Contractor shall pay all fees. o Per the City of Goldsboro, all businesses that operate within the city limits of Goldsboro must have a business registration certificate. An active business registration must be on file, prior to applying for online permits. Include all fees in bid. o Contractor will be required to submit all clearance reports to the City of Goldsboro in order for demolition permits to be issued. In addition to the City, the Contractor shall submit clearance reports to the Owner and Architect. o The City of Goldsboro Inspections Department will require One (1) Demolition Permit for each building to be demolished. Coordinate all utility termination requirements, to prevent disruption to occupied buildings, with Inspections office and Owner. Include all fees in Bid. The EPA's National Emission Standards for Hazardous Air Pollutants (NESHAP) requires an asbestos inspection and Ten (10) working days notification prior to the demolition and renovation of all commercial, institutional, or industrial facilities, except residential buildings having Four (4) or fewer dwelling units. The NESHAP requirement also applies to the demolition of all residences being demolished for commercial, institutional, or industrial purposes, Notification for all demolition is required whether or not the buildings are found to contain asbestos. Contact the NC DHHS; Health Hazards Control Unit, Application is included in Project Manual. Questions that arise from the Site Visits are to be directed to the Architect at bids@stognerarchitecture.com. NOTE: There will be no verbal instruction during the bidding period. Responses that affect Scope of Work must be in writing, dated and signed by the Architect's Representative. Written response will be in form of Addendum or Clarification only. Contractor must submit 5 working days prior to bid. Each proposal shall be accompanied by a cash deposit or a certified check drawn on some bank or trust company insured by the Federal Deposit Insurance Corporation if the bid is $250,000 or greater, of an amount equal to not less than five percent (5%) of the proposal or in lieu thereof a bidder may offer a bid bond of five percent (5%) of the bid executed by a surety company licensed under the laws of North Carolina and per Section 9 of Form 5369 and individual sureties must be listed on US Treasury Circular Number 570 to execute the contract in accordance with the bid bond and per HUD-5369 Sections 9 and 10. Five Percent shall be based on the maximum bid price, ie: Base Bid plus Unit Prices plus Contingency Allowance plus All Add Alternates. Said deposit shall be retained by the Owner as liquidated damages in event of failure of the successful bidder to execute the contract within ten (10) days after the award or to give satisfactory surety as required by law. Bid Bond is not required if bid is less than $250,000. For a Bid Security Deposit, personal and company checks are not permitted. A Performance Bond and a Payment Bond will be required for one hundred percent (100%) of the contract, Prime Contractor shall be responsible for cost of Bonds. Insurance: General Liability $1,000,000; Auto Liability $1,000,000; Worker's Comp (regardless of company size) Per State Requirements. Payment will be made on the basis of ninety percent (90%) of monthly estimates and final payment made upon completion and acceptance of work. The Owner is an Equal Employment Opportunity Employer and invites and encourages the participation of small, minority, women, and disabled (M/WBE/DBE/HUB) businesses, and prohibits discrimination against any person or business in pursuit or award of this opportunity on the basis of race, color, sex, religion, national origin, age, handicap/disability, or veteran status. The Housing Authority of the City of Goldsboro has a 20% verifiable goal for MWBE businesses in the total value of work awarded. Bidders are required to submit with their Bids affidavits and associated backup documentation of "Good Faith Efforts" in the recruitment of MWBE firms. Bidders shall submit with their bids documentation that demonstrates, to the greatest extent feasible, economic opportunities to Section 3 businesses (locally owned / operated businesses that provide employment opportunities to low-income individuals) in accordance with 24 CFR Part 135. The work is subject to the prevailing wage rates established by the U.S. Department of Labor. Payment of not less than the prevailing rates must be paid on this project. No bid may be withdrawn after the scheduled closing time for the receipt of bids for a period of Sixty (60) days. The Owner reserves the right to reject any or all bids and to waive informalities
Post-Bid
Multi-Residential
$100,000.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
March 31, 2025
1729 Edgerton St, Goldsboro, NC
Related To This Project
Goldsboro, NC
Bid Date: May 19 2025
Goldsboro, NC
Bid Date: Feb 13 2025
Goldsboro, NC
Bid Date: Jun 06 2025
Goldsboro, NC
Bid Date: Feb 24 2025
Goldsboro, NC
Bid Date: Apr 01 2025
Goldsboro, NC
Bid Date: Apr 30 2025
Goldsboro, NC
Bid Date: Jun 20 2025
Goldsboro, NC
Bid Date: Apr 22 2025
Goldsboro, NC
Bid Date: Feb 14 2025
Goldsboro, NC
Bid Date: Feb 11 2025
Goldsboro, NC
Bid Date: Feb 11 2025
Goldsboro, NC
Bid Date: Jan 09 2025
Goldsboro, NC
Bid Date: Jan 23 2025
Goldsboro, NC
Bid Date: Jan 02 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
