EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2025 at 8:00 PM

Updated October 1, 2024

Renovation and addition to a museum in Dickson City, Pennsylvania. Completed plans call for the renovation of a museum; and for the addition of a 1,411-square-foot museum.

The VFW Memorial Park Development Project Dickson City Borough, Lackawanna County, PA a) Mobilization to the site and staging. b) Material purchase and installation of temporary erosion and sediment control measures per the approved Erosion and Sediment Control Plan and specifications. c) Demolition and site preparation for proposed project items; including land clearing and rough grading, per the plan drawings and specifications. d) The procurement of all necessary materials and installation of the electrical system, per the plan drawings and specifications. e) The procurement of all necessary materials and installation of water service (lines, valves etc.), per the plan drawings and specifications. f) The procurement of all necessary materials and the installation of the American Flag and Pole, per the plan drawings and specifications. g) The procurement of all necessary materials and installation of the plantings, per the plan drawings and specifications. h) The procurement of all necessary materials and installation of the concrete retaining wall with blue stone cap and tile façade, per the plan drawings and specifications. This includes coordination with the fountain installer to install all necessary sleeving and drain pipe, the supplier provided weir and drain, and the concrete pad for the pump and filtration system. This does not include installation of the fountain pump and filtration system, providing water from the system to the fountain, testing the fountain, or the waterproof lining in the fountain bowl. i) Coordination of the installation of the six (6) owner supplied monuments by the manufacturer, per the plan drawings and specifications; including supplying and installing all necessary dowels, bolts, fasteners, grout, and epoxy. j) The procurement of all necessary materials and installation of the stamped concrete area per the plan drawings and specifications. k) The receipt, assembly, and installation of the owner supplied benches per the drawings and specifications, including all supplying and installing all necessary bolts and fasteners. l) The procurement of all necessary materials and installation of asphalt accessible asphalt pathway per the plan drawings and specifications. m) Final topsoil grading, rolling, seeding, and mulching. The bid must be submitted on forms furnished by the Landscape Architect and must be accompanied by a bid guarantee in an amount not less then ten percent (10%) of the amount of the base bid submitted. This sum will serve as a bid security and will be forfeited to Dickson City Borough, Lackawanna County, Pennsylvania as liquidated damages in the event that an award is made, and the Contract and Bonds are not promptly executed as required in the contract documents for required bonds and insurance coverage. No bid may be withdrawn for a period of sixty (60) days after the date specified for opening and reading of the bids, except as provided in accordance with the Pennsylvania Act No. 4 as approved on January 23, 1974. Dickson City Borough reserves the right to reject any and all proposals and to waive any technical defects and irregularities. Dickson City Borough reserves the right to remove any item from the project scope in the base bid form to ensure the project remains within the budget. The project site is VFW Park, Breaker Street, Dickson City, Pennsylvania 18519. Question Deadline 03/04/2025 No oral interpretations will be made to any bidder as to the meaning of Specifications, including the Drawings. Every request for such an interpretation shall be made in writing using the "Questions" feature within PennBid." Any inquiry received one week (1) or more days prior to the date fixed for opening of bids will be in the form of an addendum to the Specifications that, if issued, will be on file in the office of Woodland Design Associates, Inc. at least three (3) days before bids ar

Award

Museum

$194,110.00

Public - City

Addition, Renovation

21

29

25

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Flagpoles
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
123
Bidding Soon
1,655
All Active Projects
710
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 7, 2025

April 7, 2025

img_map_placeholder

Walker St, Dickson City, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

The VFW Memorial Park Development Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.