Published June 9, 2026 at 8:00 PM
Updated June 9, 2026
Site work for a water / sewer project in Oak Harbor, Washington. Completed plans call for site work for a water / sewer project.
Sanitary Sewer Rehabilitation Inflow and Infi Tration Correction Project Furnishing the Necessary Labor, Materials, Equipment, Tools, and Guarantees Thereof to Perform the Sanitary Sewer Rehabilitation Inflow and Infiltration Correction Project. At the Time and Date Stated Above, the Proposals Will Be Publicly Opened and Read Aloud. Proposals Are to Be Submitted Only on the Forms Provided With the Specifications. Contractors Are Invited to Submit Bids for the Sanitary Sewer Rehabilitation Inflow and Infiltration Correction Project in Oak Harbor, Washington. The Work Includes the Installation of Approximately 1,450 Linear Feet of 8-inch Diameter Gravity Sewer via Open Cut to Replace Undersized 6-inch Sewer, Four (4) 48-inch Sanitary Manholes, Approximately 9,200 Linear Feet of 8-inch Diameter and 12-inch Diameter Cipp Sewer Lining, Approximately 30 Cipp Lateral Liners Extending Up to Five (5) Feet From the Mainline Sewer, and Reinstatement of Existing Active Sanitary Sewer Service Laterals on the Sewer Segments Repaired and Replaced. This Work Also Includes Hma Trench Repair and General Surface Restoration. All Work Shall Be in Conformance With the Contract Plans, Contract Provisions, and the 2026 Standard Specifications for Road, Bridge, and Municipal Construction. The Work Shall Be Physically Completed Within 120 Calendar Days After the Commencement Date Stated in the Notice to Proceed. All Bidding and Construction is to Be Performed in Compliance With the Request for Proposal, Plans, Specifications, and Contract for This Project and Any Addenda Issued Thereto, Which Are on File at the Office of the City Clerk, City Hall, City of Oak Harbor, Washington. The Engineers Opinion of Probable Cost Ranges From $1,800,000 to $1,900,000. This Project is Funded by a Federal EPA Grant and is Subject to All Requirements of Federal Acquisition Regulation (Far) and Recipients of EPA Grant Awards, Including but Not Limited to Davis-bacon and Related Acts (Dbra) and Washington State Prevailing Wage Determinations (Specification Sections 00830, 00840, 00850, and Appendix a), Compliance With the Contract Work Hours and Safety Standards Act, Compliance With and Completion of the Byrd Anti-lobbying Amendment Certification The City of Oak Harbor Reserves the Right to Postpone the Award for 60 Calendar Days After Bid Opening. The Owner Intends to Award a Contract to the Lowest Responsible and Responsive Bidder. Each Bid Must Be Accompanied by a Cashiers Check, Money Order, or Surety Bid Bond in the Amount of Not Less Than Five Percent (5%) of the Total Bid, Made Payable to the City of Oak Harbor. A Performance Bond as Well as a Labor and Material Payment Bond Will Be Required With the Contract. No Bidder May Withdraw Its Bid After the Hour Set for Its Opening or Before the Award of the Contract, Which Normally Occurs Within 45 Calendar Days After Bid Opening. Last Day for Questions: June 17, 2026 (by Noon Pst) Last Day for Addenda to Be Issued: June 24, 2026 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
GC Bidding
Water / Sewer
$1,900,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2026
September 1, 2026
To Be Determined, Oak Harbor, WA
Related To This Project
Oak Harbor, WA
Bid Date: Mar 18 2025
Oak Harbor, WA
Bid Date: May 23 2025
Oak Harbor, WA
--
Oak Harbor, WA
Bid Date: Jun 18 2025
Oak Harbor, WA
Bid Date: Jun 16 2025
Oak Harbor, WA
Bid Date: Jun 16 2025
Oak Harbor, WA
Bid Date: Jan 30 2025
Oak Harbor, WA
--
Oak Harbor, WA
--
Oak Harbor, WA
--
Oak Harbor, WA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.