Published March 12, 2025 at 8:00 PM

Updated March 13, 2025

Site work and paving for a road / highway in Plattsmouth, Nebraska. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of March 12, 2025 project was awarded to Pavers, awarded amount is $1,078,535.20 ** The board reserves the right to accept or reject each proposal, and each proposal that does not comply with the bidding requirements will be rejected. Bid will be awarded based off of Grand Total Price. LOCATION A: On Rock Bluff Road from 7700 feet east of Highway 75 going east for 6684 feet to include intersection aprons and driveways that are currently asphalted or concreted. (Estimated 6684 ft by 24 ft of main line paving) LOCATION B: On 27 th Ave. starting at Rock Bluff Road going north for 1027 feet to end of asphalt. To include intersection aprons and driveways that are currently asphalted or concreted. ( Estimated 1027ft by 24ft of main line paving) LOCATION C: On 27 th Ave from Rock Bluff Road to Murray Road. To include intersection aprons and driveways that are currently asphalted or concreted. ( Estimated 3302ft by 24ft of main line paving) LOCATION D: On Murray Road starting at 27 th Ave going west for 10,450 feet and stopping 2150 feet east of Highway 75. To include intersection aprons and driveways that are currently asphalted or concreted. (Estimated 10,415ft by 24ft of main line paving) PART E: On Havelock Ave. 4657 feet west of Highway 75. The full removal of asphalt approaches and replacing to the rail crossing. Contractor will need to work in cooperation with the railroad rules for work within there right of way. (Estimated 40ft by 22ft and 30ft by 22ft) LOCATION F: Patching area's county wide Detailed list will be compiled at the start of construction Notice is hereby given that the Cass County Board of Commissioners is extending an invitation for sealed bids for the placement of 23,930 sq. ft. of asphalt patching, 4.07 miles of asphalt overlay, and 516,016 sq. ft. of asphalt milling. The project consists of furnishing all labor, materials and equipment neces sary to complete the construction of the project. All proposals shall remain in effect for a period of 30 calendar days after the scheduled closing time for the receipt of proposals. A bid bond or check in the amount equal to 5% of the total amount proposal shall accompany each proposal. Bond or check shall be made payable to the Treasurer of Cass County, Nebraska, which is agreed shall be forfeited should the successful bidder fail to enter into contract with Cass County or fail to furnish bond and securities in accordance with the proposal.

Award

Roads / Highways

$1,078,535.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
89
Bidding Soon
930
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

March 27, 2025

Project location map

Multiple Locations, Plattsmouth, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.