BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Renovation of an educational facility in Keams Canyon, Arizona. Completed plans call for the renovation of a educational facility.

Gym Floor Replacement Kces Questions and Answers: Any questions relating to this solicitation shall be submitted to the following individuals: Contract Specialist (CS), Contracting Officer (CO) and Contracting Officer's Representative (COR) no later than February 26, at 3:00pm MST. Any questions sent shall be submitted on the Questions and Answers Log attached to this RFP. The Contractor shall begin performance within 10 calendar days and complete it within 60 calendar days PROJECT LOCATION: Keams Canyon Elementary School 100 Main Street, Building 48 Keams Canyon, AZ 86034 BONDING REQUIREMENTS: a. Bid Bond - The amount of the bid bond shall be 20% of the original contract price. b. Performance Bond - The amount of the performance bond shall be 100% of the original contract price. c. Payment Bond - The amount of the payment bond shall be 100% of the original contract price. d. Individual Surety - The bidders shall comply with FAR Clause 52.228-11, Pledge of Assets. e. Third Party Indemnification Agreements. The bidder shall furnish a copy of any indemnification agreements that it entered into in order to secure the bonds required by the solicitation by the time set for bid opening. If an indemnification agreement was not requirement in order for the bidder to obtain the required bonds, an affidavit to that effect shall be provided by the surety along with the bid bond by the time set for bid opening. Failure to furnish a copy of the required indemnification agreement or the surety's affidavit may cause the bid to be rejected. In accordance with FAR Part 36.204 -Disclosure of the Magnitude of Construction Projects, the estimated price range is between $100,000.00 - $250,000.00. The Contractor shall begin performance within 10 calendar days and complete it within 60 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$199,847.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
5
Bidding Soon
98
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 7, 2025

Project location map

100 Main St, Keams Canyon, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.