BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2025 at 7:00 PM

Updated March 4, 2025

Site work and paving for a mixed-use development in Fair Grove, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and bridge / tunnel.

The proposed work generally includes the following: Construction of 5' wide concrete sidewalk, access connections, culverts, and ADA accessibility along with any incidental work related thereto. NOTE: Striping and sealing as well as signage is not to be considered within this bid. Sidewalk along S. Orchard Blvd. to City Hall Bid shall include extend the existing 5' wide sidewalk, located south of the intersection of Hwy 125 and S. Orchard Blvd., approximately 500' along S. Orchard Blvd. south to a location approximately across from the existing City Hall/ Library Driveway. Construction shall also include a 5' wide sidewalk to the street edge with ADA accessibility along with an ADA accessible landing pad located across S. Orchard Blvd. and next to the existing City Hall driveway. Bidders shall be responsible for field verifying all requirements, coordinating all work, providing all labor, parts, and appurtenances, and all other work necessary to provide a complete ADA accessible sidewalk. All contractors are subject to full compliance with all applicable laws, ordinances, rules and regulations. The Contractor and their subcontractors will be obligated not to discriminate in employment practices. The owner reserves the right to waive any informalities or to reject any or all bids.

Post-Bid

Sidewalks / Parking Lot

$30,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

6

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
34
Bidding Soon
587
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

March 31, 2025

Project location map

Multiple Locations, Fair Grove, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.