BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 22, 2026 at 8:00 PM

Updated August 27, 2026

Site work and outdoor lighting for a road / highway in Juneau, Alaska. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The Contractor is responsible for the means, methods, techniques, sequence, and procedures of construction, safety, and quality control . This includes ensuring safety and overseeing the safety of all personnel and Subcontractors. In the event of a multi-employer site, the Contractor is the controlling employer responsible for coordinating site-wide safety efforts, ensuring compliance with applicable safety regulations, and mitigating potential hazards across all employees, Subcontractors or suppliers on the site, consistent with any applicable federal, state, and local laws, rules, regulations, and ordinances. Replace existing High-Pressure Sodium(HPS) with newer, efficient LED light heads on all light poles along Egan Drive between 10th Street and Mendenhall Loop Boulevard. The Engineers Estimate is berween $1,000,000 and $2,500,000 A bidder may direct questions concerning bidding procedures and requirements to: Email: srdotpfcontracts@alaska.gov Phone: (907) 465-4493 AK DOT - JNU Egan Drive Lighting Improvements Question Deadline 08/18/2026

Post-Bid

Roads / Highways

$2,500,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

54

6

2

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
37
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

October 19, 2026

Project location map

Egan Dr, Juneau, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.