Site work and paving for a mixed-use development in Oak Park, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 8 2025, the project was awarded to JM Construction, with an awarded amount of $293,318.62.** Reference Number: 0000375540 The project consists of approximately removing and replacing 599 lft of 6" to 12" catch basin lines and concrete replacement, along with clean up and traffic control. Machines used for this project must be equipped with rubber tracks and/or rubber tires. No steel tracks may be used during the project. Question Deadline 02/24/2025 at 4:00 PM ET Questions are submitted online: No. Each proposal shall be accompanied by a certified check, cashier's check, money order or bid bond by a surety company licensed to do business in the State of Michigan in the amount of at least five (5%) percent of the amount bid, drawn payable to the City of Oak Park, Michigan, as security for the proper execution of the Contract. The successful bidder will be required to provide performance bonds, and payment bonds each in the amount of one hundred percent (100%) of the contract amount, and a maintenance and guarantee bond in the amount of Fifty percent (50%) of the contract amount. The City of Oak Park, Michigan reserves the right to reject any and all bids in its sole discretion, in whole or in part, for any reason or for no reason at all. Any informalities or irregularities in bids may be waived by the City of Oak Park for any reason, or for no reason at all, in the sole discretion of the City. Bids may not be withdrawn for a period of sixty (60) days after the actual date of opening thereof. The bid guarantee of Bidders under consideration will be returned immediately after execution of the contract documents by the Owner; checks and money orders of Bidders not under consideration will normally be returned within forty-eight (48) hours after bid opening. The amount of the guarantee shall be forfeited to the Owner if the successful Bidder fails to enter into a contract and furnish the required bonds and insurance certificates within fifteen (15) days after award of the contract. The contractor understands that the term of this contract is for twelve (12) months, with an option to extend for an additional twelve (12) months, if mutually agreed to by the parties. The City shall have the right to not extend this contract for any reason or for no reason at all. The dates for completing the above mentioned work, as set forth in the contract, must be adhered to by the contractor, and any additional work will be scheduled by mutual agreement between the parties. The City of Oak Park does not discriminate in its employment or any other programs or activities on the basis of sex, race, color, age, height, weight, marital status, national origin, religion or disability. We provide reasonable accommodations for qualified individuals with a disability if requested. ** Bid date info : Address all bids to the CITY CLERK, in a sealed envelope which clearly states: PROPOSAL FOR: 2025 CATCH BASIN LINE REPLACEMENT PROJECT, M-779 14000 Oak Park Boulevard Oak Park, Michigan 48237 Contact Dan Samuel at (248) 691-7580 with specific questions about this bid.

Award

Roads / Highways

$293,319.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
124
Bidding Soon
1,700
All Active Projects
731
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 7, 2025

img_map_placeholder

Multiple Locations, Oak Park, MI

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Catch Basin Line Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.