EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in South Londonderry Township, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Contract No. 4 work will include, but not necessarily be limited to, installation of approximately 1,360 LF of guiderail. PROJECT DESCRIPTION A. Project Identification: Project consists of, but not necessarily limited to, installation of approximately 1,360 LF of Type 31 strong post approach guiderail using Long Span System across the bridge structure and resetting of existing signs and posts. 1. Project location: Various roads within the Township as shown on the attached map. Church Road: Bridge over Unnamed Tributary to the Little Chiques Creek (40.21968, - 76.50186) East Patrick Road: Bridge over Little Conewago Creek (40.24289, -76.550814) Eckert Road - West: Bridge over Little Conewago Creek (40.21596, -76.55875) Long Road: Bridge over Unnamed Tributary to Conewago Creek (40.22246, -76.56827) West Patrick Road: Bridge over Unnamed Tributary to Little Conewago Creek (40.24158, -76.5654) 2. OWNER: South Londonderry Township, 27 W. Market Street, Palmyra, PA 17078. B. ENGINEER Identification: The Contract Documents were prepared for the Project by: RETTEW Associates, Inc., 5031 Richard Lane, Suite 111, Mechanicsburg, PA 17055. C. This project shall include furnishing all labor, equipment, material, and appurtenances to complete all work in accordance with the Contract Documents. The work will include, but not necessarily be limited to, the following, as identically numbered in the UNIT PRICE SCHEDULE: 1. Mobilization/Demobilization (1 LS) 2. Traffic Control (1 LS) Church Road 3. Type 31 Strong Post Guiderail, complete in place (226 LF) 4. Permanent Impact End Treatment, Type 2, complete in place (2 EA) 5. Terminal end section - single, complete in place (2 EA) East Patrick Road 6. Type 31 Strong Post Guiderail, complete in place (340 LF) 7. Permanent Impact End Treatment, Type 2, complete in place (2 EA) 8. Terminal end section - single, complete in place (2 EA) Question Deadline 02/28/2025 at 12:00 PM ET Location : online portal. Only those questions submitted online Questions received after regarding the project will not be acknowledged. A certified check or bid bond for the amount of 10 percent of the total bid shall be required. Bonds are to be issued by a surety licensed to do business in the Commonwealth of Pennsylvania. This Contract is subject to the following: the Pennsylvania Prevailing Wage Act conditions (Contract No. 1, 3, 4, and 5); the Federal Occupational Safety and Health Act of 1970 (OSHA) conditions; the Pennsylvania Act 229 of 2002; the Pennsylvania One Call Act, also known as the Underground Utility Line Protection Law, Act 287 of 1974, as amended; the Pennsylvania Human Relations Act 222 Condition; requirement of a noncollusion affidavit; the non-discrimination in Employment/Contract Compliance Regulations Conditions; and the Public Works Employment Verification Act. South Londonderry Township Board of Supervisors reserves the right to accept or reject any or all Bids.

Bid Results

Sidewalks / Parking Lot

$69,908.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
128
Bidding Soon
1,817
All Active Projects
856
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

April 3, 2025

img_map_placeholder

Multiple Locations, South Londonderry Township, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Roadway Project Contract No. 4 - Guiderail

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.