Published February 26, 2025 at 7:00 PM

Updated February 28, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Kellogg, Idaho. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project will remove the existing three-span concrete girder bridge for Bunker Avenue over the S Fork Coeur d'Alene River in the City of Kellogg, Idaho. The bridge will be replaced with a new single span, side-by-side, prestressed concrete thin deck girder bridge with a concrete deck and integral abutments on driven steel H-piles. The new 158-foot long, 47-foot wide, single-span prestressed concrete girder bridge will be constructed approximately on the existing alignment. A concrete deck will serve as the driving surface of the bridge. The new bridge abutments will be supported by steel H-piles. The roadway approaches to the bridge will be reconstructed approximately 64-feet to the south and 75-feet to the north of the new bridge to accommodate the wider structure. The new bridge will provide two lanes of traffic, five-foot shoulders, and elevated sidewalks to accommodate pedestrian traffic. The roadway profile grade will approximately match the existing grade to prevent impacts to the I-90 interchange ramps to the north. Question Deadline 02/24/2025 at 5:00 PM PT Bridge KN 30766; Bunker Ave over S Fork Coeur d’Alene River Bridge Replacement This project will remove the existing three-span concrete girder bridge for Bunker Avenue over the S Fork Coeur d’Alene River in the City of Kellogg, Idaho. The bridge will be replaced with a new single span, side-by-side, prestressed concrete thin deck girder bridge with a concrete deck and integral abutments on driven steel H-piles. The new 158-foot long, 47-foot wide, single-span prestressed concrete girder bridge will be constructed approximately on the existing alignment. A concrete deck will serve as the driving surface of the bridge. The new bridge abutments will be supported by steel H-piles. The roadway approaches to the bridge will be reconstructed approximately 64-feet to the south and 75-feet to the north of the new bridge to accommodate the wider structure. The new bridge will provide two lanes of traffic, five-foot shoulders, and elevated sidewalks to accommodate pedestrian traffic. The roadway profile grade will approximately match the existing grade to prevent impacts to the I-90 interchange ramps to the north

Post-Bid

Bridges / Tunnels

$2,450,000.00

Public - City

Demolition, New Construction, Paving, Site Work

124

19

9

3

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
27
Bidding Soon
301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

May 1, 2025

Project location map

Bunker Ave, Kellogg, ID

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.