BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 5, 2025 at 8:00 PM

Updated June 6, 2025

Site work for a water / sewer project in Kellogg, Idaho. Completed plans call for site work for a water / sewer project.

The Project includes the following Work: Kellogg East - The re-grading of the soil around the site. The installation of a swale in between the Trail of the Coeur d'Alenes and East Station Avenue. The swale will utilize the existing 36" culvert inlet allowing flow into the Coeur d'Alene River. Riprap will be installed around the culvert inlet. A 10' gravel path will be installed just west of the swale to provide connection of Station Ave and the Trail of the Coeur d'Alenes. A gravel area will be installed just south of the swale for snow storage in the winter months. Government Gulch- The removal of the existing concrete ditch, the regrading of the area, and installation of the swale. The swale will utilize the existing ditch along the road. Riprap will be installed as armoring on slopes larger than 4% within the swale area. An alternative bid item is replacing a 60" culvert under an existing driveway. The project is located within the Bunker Hill Superfund Site. Subsurface soils are known to be contaminated by heavy metals that are associated with historic mining wastes. Bids are requested for the following Contract: Sustainable Stormwater Improvements - Phase 2. The Project must be complete by October 15, 2025. Contract questions should be directed only to the Project Engineer, Felicia Cassidy, (208) 512-0295 or email felicia.cassidy@alta-se.com. Document Note: Contractor is required to own a current copy of the Idaho Standards for Public Works Construction (ISPWC) to bid the project. Bidding documents may also be examined at the Kellogg City Hall located at 1007 McKinley Avenue, Kellogg, ID, 83837. Question Deadline 04/29/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Felicia Cassidy at felicia.cassidy@alta-se.com

Bid Results

Water / Sewer

$242,920.00

Public - City

Site Work

22

11

4

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
27
Bidding Soon
306
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

July 7, 2025

Project location map

Multiple Locations, Kellogg, ID

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.