BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2025 at 8:00 PM

Updated April 17, 2025

Site work and paving for a sidewalk / parking lot in Summit Township, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Bidders will be required to meet the City of Jackson's pre-qualification requirements prior to bid opening. Bidders must be prequalified for STREET (A) The City of Jackson does not discriminate on the basis of race, religion or national origin, color, age, sex, height, weight, marital status, partisan considerations, genetic information, and physical or mental disability as to: access, availability, employment, or participation in any of its programs and activities. The work includes the following partial listing of items with approximate quantities: 0.76 miles of non-motorized trail reconstruction with concrete pavement along the MLK Equality Trail between Weatherwax Drive and Optimist Shelter in the City of Jackson, Jackson County, Michigan. Major bid items include: Clearing - 1.84 acres, HMA Surface, Rem, modified - 3,777 syd, Aggregate Base, 6 inch, 21AA Modified - 5,309 syd, Shared Use Path, Conc - 5,257 syd, shared use path grading - 3,978 feet, Turf Establishment, Performance - 14,391 syd. Question Response Deadline:March 11, 2025, 4:30pm Response Submission Deadline:March 18, 2025, 10:00am

Bid Results

Sidewalks / Parking Lot

$699,670.00

Public - City

Paving, Site Work

18

5

8

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
1
Bidding Soon
1,536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 1, 2025

Project location map

Weatherwax Dr, Summit Township, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.