Site work and paving for a mixed-use development in Olivehurst, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

**As of April 4,2025, project was awarded to RCI GENERAL ENGINEERING, awarded amount is $6,618,148.80.** Historic Olivehurst Pipeline Replacement Project - Phase 2 Project Description: 1. Notice is hereby given that the Olivehurst Public Utility District will receive sealed bids from bidders for the construction of the Historic Olivehurst Pipeline Replacement Project - Phase 2 at 1970 9th Ave, Olivehurst, CA 95961. This project consists of constructing approximately 15,000 feet of new PVC C900 water main to replace existing steel mains. The project includes providing approximately 325 new service connections for residential meters. In addition to reconnecting to existing meters, some of the meters will need to be relocated to make way for new curb, gutter, and sidewalk to be constructed at a later date. As part of the water main installation all associated appurtenances will also be installed, including shut off valves, fire hydrants, blow off and air release valves (where applicable and outlined in the contract documents). Due to the future County storm drain project, portions of the project have different requirements for pavement restoration and include callouts for 'future storm drain' which are meant to be accommodated. Mainline installation shall be installed to avoid conflicts with the future storm drain as seen in the contract documents. Due to necessary work required to reconnect residential services, contractor shall anticipate the need for sufficient coordination with residents to establish rights of entry to complete work beyond standard right of way and beyond existing residential fencing as shown on the contract documents. Location of Work: Census Designated Place - Olivehurst including portions of Western Avenue, 8th Avenue, 9th Avenue, and 10th Avenue. Completion of Work: All work shall be completed within 210 calendar days from the date specified in the Notice to Proceed. The Engineer's Opinion of Probable Costs is approximately $5,500,000 to $6,500,000. Reservation of Rights: Owner specifically reserves the right, in its sole discretion, to reject any or all Bids, to re-bid, or to waive inconsequential defects in bidding not involving time, price or quality of the work. Owner may reject any and all Bids and waive any minor irregularities in the Bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. (Questions due on March 20th by 2 PM,

Award

Water / Sewer

$6,618,149.00

Public - City

Paving, Site Work

43

23

151

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
103
Bidding Soon
1,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 2, 2025

Project location map

1970 9th Ave, Olivehurst, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.