Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2025 at 7:00 PM
Updated February 13, 2025
Site work and paving for a mixed-use development in Ozark, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
RFQ 2025-1 Engineering Projects Length: 1.5 8-12' concrete trail from Route FF & Republic Rd south along the east side of Route FF to near William St and 10' concrete trail from Route FF and Republic Road east along Republic Road to existing southern terminus of Wilson's Creek Greenway Trail. DBE Goal: 5% Conceptual Study - Alternatives analysis for at least two (2) different alignments of each segment, including estimated construction cost. Surveying-All field surveying including mapping, bridge survey report, geotechnical layout, right of way staking & location survey. Geotechnical-all work necessary for the project including bridge and potential retaining walls. Public Outreach-assist with in-person & virtual public meetings/hearings. Trail/Sidewalk Design-preparation of preliminary, right of way and final design plans. Bridge Design-preparation of bridge memo, layout, final bridge design for new bridges. Right of Way Acquisition-Consultant to provide property exhibits, legal descriptions and monumentation as required. Environmental-Consultant will provide environmental documentation to complete the RER, including Section 106 clearance Purpose. The Ozarks Transportation Organization (OTO) is requesting proposals for professional engineering services from qualified engineering firms for engineering and design (includes completing the Environmental Documentation) for the listed trail, sidewalk and roadway projects. Services shall include all environmental documentation, survey, preliminary and final design plans, specifications, bid book, and PS&E documents. These services shall be performed in accordance with all local, State, and Federal laws and regulations. Interviews/presentations are not anticipated for the consultant selections. OTOs Project Manager, Jen Thomas, will accept phone calls or emails to answer questions at ithomas@ozarkstransporation.org. The method of Contractor Selection has not been Determined at this time. Any questions relative to interpretation of this RFQ shall be addressed to Jen Thomas in ample time before the period set for the receipt and opening of submissions. Any interpretation made to prospective proposers will be expressed in the form of an amendment to the RFQ which, if issued, will be conveyed to all prospective proposers not later than five (5) days prior to the date set for receipt of submissions via the OTO website Notice to Proceed: May 15, 2025 MO DOT - RFQ Engineering - Wilsons Creek Trail-Rte FF Pedestrian Improvements
Conceptual
Roads / Highways
$1,700,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
Multiple Locations, Ozark, MO
Related To This Project
Ozark, MO
Bid Date: Mar 25 2025
Ozark, MO
Bid Date: Apr 03 2025
Ozark, MO
Bid Date: Mar 27 2025
Ozark, MO
Bid Date: Apr 07 2025
Ozark, MO
Bid Date: Mar 27 2025
Ozark, MO
--
Ozark, MO
Bid Date: Apr 14 2025
Ozark, MO
Bid Date: Feb 25 2025
Ozark, MO
Bid Date: Feb 20 2025
Ozark, MO
Bid Date: Jan 30 2025
Ozark, MO
--
Ozark, MO
Bid Date: Nov 25 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
