EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 12, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Ozark, Missouri. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

RFQ 2025-1 Engineering Projects Length: 0.27 10' concrete trail along Route OO from Washington Ave to Transland DBE Goal: 5% Surveying-All field surveying including mapping, bridge survey report, geotechnical layout, right of way staking & location survey. Public Outreach-assist with in-person & virtual public meetings/hearings. Trail/Sidewalk Design-preparation of preliminary, right of way and final design plans. Right of Way Acquisition-Consultant to provide property exhibits, legal descriptions and monumentation as required. Environmental-Consultant will provide environmental documentation to complete the RER, including Section 106 clearance. Purpose. The Ozarks Transportation Organization (OTO) is requesting proposals for professional engineering services from qualified engineering firms for engineering and design (includes completing the Environmental Documentation) for the listed trail, sidewalk and roadway projects. Services shall include all environmental documentation, survey, preliminary and final design plans, specifications, bid book, and PS&E documents. These services shall be performed in accordance with all local, State, and Federal laws and regulations. Interviews/presentations are not anticipated for the consultant selections. OTOs Project Manager, Jen Thomas, will accept phone calls or emails to answer questions at ithomas@ozarkstransporation.org. The method of Contractor Selection has not been Determined at this time. Any questions relative to interpretation of this RFQ shall be addressed to Jen Thomas in ample time before the period set for the receipt and opening of submissions. Any interpretation made to prospective proposers will be expressed in the form of an amendment to the RFQ which, if issued, will be conveyed to all prospective proposers not later than five (5) days prior to the date set for receipt of submissions via the OTO website Notice to Proceed: May 15, 2025 MO DOT - RFQ Engineering - Route 66-Phase 3

Conceptual

Roads / Highways

$3,324,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
30
Bidding Soon
395
All Active Projects
178
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFQ Engineering - Route 66-Phase 3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.