BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 18, 2026 at 8:00 PM

Updated May 20, 2026

Site work and paving for a mixed-use development in San Lorenzo, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

Project has been Rebid The Project consists of providing construction area signs; providing and implementing a traffic control plan; providing and implementing stormwater pollution prevention plan; providing construction site management; sweeping streets; notifying and coordinating with utility companies, businesses, and property owners; clearing and grubbing; construction survey staking; performing minor roadway excavation and site grading; constructing pervious concrete sidewalk, concrete curb and gutter, and driveways; modifying drainage structure; utility relocation and adjustments; planting street trees; pavement repair; roadway milling and resurfacing; installing striping, pavement markings, and signing; and cleaning of the site at the end of the job. Include a bidder's security equal to at least 10 percent of the bid. ALLOTTED TIME FOR COMPLETION: 120 working days. The Contractor must have a Class A or C-8 license to submit a bid. Licensing must be maintained throughout the Contract duration. The Board of Supervisors reserves the right to reject any or all bids and any or all items of such bids. Direct questions regarding bid submission to 510-670-5450

Post-Bid

Roads / Highways

$2,650,800.00

Public - County

Paving, Site Work

29

16

17

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2026

July 6, 2026

Project location map

W Sunset Blvd, San Lorenzo, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.