Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 17, 2025 at 7:00 PM
Updated February 18, 2025
Site work, paving and outdoor lighting for a mixed-use development in Seatac, Washington. Working plans call for site work for a road / highway; sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; water / sewer project; and for outdoor lighting for a sidewalk / parking lot.
Construct two-way cycle track on north side of 176th St; bike lanes and sharrows on 32nd Ave and 180th St; sidewalks up to 8 ft with landscaped buffer along 176th St, 180th St, and 32nd Ave; raised ped crossings at the intersections of 32nd Ave with 175th, 173rd, 172nd; raised mid-block ped crossing on 32nd Ave. Remove turn lanes at intersections of 176th St with International Blvd and 32nd Ave to shorten ped crossings. New signal at 176th St/32nd Ave to accommodate non-motorized phases, ped signal upgrades at 176th St/International Blvd. The project will install roadway and pedestrian lighting, infrastructure to support EV charging stations along 32nd Ave S, landscaping, and ped amenities. Supporting work includes earthwork, retaining walls, undergrounding utilities, upgraded water/sewer/stormwater, and paving. TAP funds will be applied to acquire ROW to accommodate the new bike lanes, sidewalks, and buffers; all other elements will be funded by local/other funds Length : 1.330 County: King Agency: SeaTac Begin Termini : Various End Termini : Various As of February 13, 2025, the project is in Final Planning status. Anticipated letting year is 2025. WADOT - SR 202 Shared Use Trail Extension *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Water / Sewer
$24,224,154.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
Multiple Locations, Seatac, WA
Related To This Project
Seatac, WA
Bid Date: Mar 25 2025
Seatac, WA
Bid Date: Mar 21 2025
Seatac, WA
Bid Date: Apr 22 2025
Seatac, WA
--
Seatac, WA
Bid Date: Feb 27 2025
Seatac, WA
Bid Date: Feb 19 2025
Seatac, WA
Bid Date: Jan 15 2025
Seatac, WA
Bid Date: Dec 17 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
