BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated October 21, 2025

Site work and outdoor lighting for a mixed-use development in Beaver, Utah. Completed plans call for site work for a educational facility; for outdoor lighting for a educational facility; playground / park / athletic field; and playground / park / athletic field.

Awarded company "BWline" Amount $321,001.00 Lighting fixtures and accessories including exterior lights and emergency lights and special effects devices and portable and temporary lighting and accessories and stage and studio lighting and accessories Question Deadline 03/05/2025 at 12:00 AM MT online submission. Scope of Work: The Contractor shall be responsible for the design, engineering, procurement, installation, testing, and commissioning of new LED lighting systems at both football fields. This includes, but is not limited to: Lighting Fixtures: Providing and installing new LED lighting fixtures as specified in either Proposal A or Proposal B (see Section 4). COB technology is preferred. Controls: Providing and installing new lighting control systems meeting the specifications outlined in Section 3. Wiring and Connections: Providing and installing all necessary wiring, connections, and conduit for the new lighting systems. All wiring and connections shall be contained within appropriate enclosures. Enclosures: Providing and installing enclosures for drivers, controls, and all wiring connections. Testing and Commissioning: Conducting thorough testing and commissioning of the new lighting systems to ensure they meet the specified performance requirements. This includes verification of illumination levels and proper operation of all controls, including RGB color functionality for Proposal B. Documentation: Providing complete documentation for the installed systems, including as-built drawings, equipment specifications, operating instructions, and maintenance manuals. Permitting: Obtaining all necessary permits and approvals for the project. Site Cleanup: Removing and disposing of all replaced materials and debris, leaving the sites clean and orderly. 3. Control System Specifications: The lighting control system must meet the following requirements:Wireless Communication: Utilizes 802.15.4 mesh network protocol for wireless communication between fixtures and the central controller. System Alerts: Provides system alerts indicating loss of communication with any fixture. Dimming: Offers smooth dimming from 100% down to 10% and dim-to-off functionality. Individual Light Control: Enables individual control of each light fixture to reduce energy consumption and create custom light scenes. Remote Control: Allows scheduling and control of the system via Wi-Fi, LAN, and/or cellular connectivity for remote operation. Pre-Programmed Scenes: Stores up to 25 pre-programmed scenes assignable to a push-button controller for manual on-premise operation. Dynamic Entertainment Scenes: Capable of dynamic entertainment light scenes (e.g., lights flashing, paparazzi effect, etc.). Mobile App Compatibility: Compatible with iOS and Android devices for multiple user control. User Accounts and Permissions: Supports multiple user accounts with the ability to assign various system permission levels. Scheduled Events: Ability to schedule recurring events at fixed times. Firmware/Software Upgrades: Capable of firmware/software upgrades. Commissioning: Supports onsite and/or remote commissioning. Control Button Station Enclosure: NEMA 4X molded fiberglass reinforced polyester enclosure with internal gasket and stainless steel, quick-release latches with ability to padlock for security purposes. Controller Memory Protection: Controller shall be protected against memory loss during power outages. If power failure to the controller occurs during use, lights shall default to 100% on. Once power is restored, the controller shall resume normal event control

Award

Playgrounds / Parks / Athletic Fields

$321,001.00

Public - County

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
7
Bidding Soon
101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

March 17, 2025

Project location map

Multiple Locations, Beaver, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.