EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 28, 2025 at 7:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Neenah, Wisconsin. Completed plans call for site work for a water / sewer project.

Est. Value: $ 1,850,000.00 Pre-Qualification: Yes OWNER The Village of Greenville acting through its Village Board, hereby gives notice that Bids will be received for the following described project. PROJECT The work shall consist of construction of 8-inch and 12-inch water main installation (approximately 4,400 linear feet) and 8-inch sanitary sewer installation (approximately 3,900 linear feet). The improvements are located along STH 96, between Schultz Farm Road and Glenview Drive, and in the Greenville Lions Park. The work incudes bore and jack, directional bore, pavement restoration, traffic control, erosion controls, and landscaping restoration. Bids will be received on the following Contract: STH 96 LIONS PARK WATER & SEWER BID SECURITY No Bid shall be received unless accompanied by a Certified Check or satisfactory Bid Bond payable to the Village of Greenville in an amount not less than 10% of the maximum Bid as a guarantee that, if the Bid is accepted, the Bidder will execute and file the Contract, Performance/Payment Bonds and Insurance Certification, as required by the Contract Documents, within 15-days after the Notice of Award. BID REJECTION The OWNER reserves the right to reject any and all Bids, waive any informalities in Bidding or to accept the Bid or Bids which best serves the interests of the Village of Greenville. Thework shal consist of constructionof 8-inchand12-inch water main installation (approximately4,40 linear feet) and 8-inchsanitarysewer instalation(approximately 3,90 linear feet). The improvements are locatedalong STH 96, betweenSchultz FarmRoadand Glenview Drive, and inthe Greenville Lions Park. The workincudes bore and jack, directional bore, pavementrestoration, trafic control, erosion controls, and landscaping restoration. PROOF OF RESPONSIBILITY A Proof Of Responsibility (Pre-Qualification) Form for all Contracts in excess of $10,000 must be filed in the office of the Village Administrator not later than five (5) calendar days prior to the date of receiving Bids, and shall show sufficient ability, equipment and experience to properly perform the Contract. The Village of Greenville's decision as to qualifications shall be final. WITHDRAWAL OF BIDS No Bid shall be withdrawn for a period of 60-days after the scheduled opening without the consent of the OWNER. GOVERNING LAWS & REGULATIONS The Contract letting shall be subject to the provisions of Sections 66.0901, 66.0903 and 779.16 of the Wisconsin Statutes.

Bid Results

Water / Sewer

$1,463,528.00

Public - City

Site Work

3

3

2

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Watering, Bases, Ballasts, and Paving, Rigid Paving, Unit Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Valves, Sanitary Sewerage Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
42
Bidding Soon
536
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 28, 2025

img_map_placeholder

Multiple Locations, Neenah, WI

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

STH 96 Lions Park Water & Sewer

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.