BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2025 at 8:00 PM

Updated April 8, 2025

Site work for a water / sewer project in Neenah, Wisconsin. Completed plans call for site work for a water / sewer project.

**As of April 04, 2025, the project was awarded to Robert J. Immel Excavating, Inc., with an awarded amount of $1,557,834.90.** Est. Value: $ 1,850,000.00 Pre-Qualification: Yes OWNER The Village of Greenville acting through its Village Board, hereby gives notice that Bids will be received for the following described project. PROJECT The work shall consist of construction of 8-inch and 12-inch water main installation (approximately 4,400 linear feet) and 8-inch sanitary sewer installation (approximately 3,900 linear feet). The improvements are located along STH 96, between Schultz Farm Road and Glenview Drive, and in the Greenville Lions Park. The work incudes bore and jack, directional bore, pavement restoration, traffic control, erosion controls, and landscaping restoration. Bids will be received on the following Contract: STH 96 LIONS PARK WATER & SEWER BID SECURITY No Bid shall be received unless accompanied by a Certified Check or satisfactory Bid Bond payable to the Village of Greenville in an amount not less than 10% of the maximum Bid as a guarantee that, if the Bid is accepted, the Bidder will execute and file the Contract, Performance/Payment Bonds and Insurance Certification, as required by the Contract Documents, within 15-days after the Notice of Award. BID REJECTION The OWNER reserves the right to reject any and all Bids, waive any informalities in Bidding or to accept the Bid or Bids which best serves the interests of the Village of Greenville. Thework shal consist of constructionof 8-inchand12-inch water main installation (approximately4,40 linear feet) and 8-inchsanitarysewer instalation(approximately 3,90 linear feet). The improvements are locatedalong STH 96, betweenSchultz FarmRoadand Glenview Drive, and inthe Greenville Lions Park. The workincudes bore and jack, directional bore, pavementrestoration, trafic control, erosion controls, and landscaping restoration. PROOF OF RESPONSIBILITY A Proof Of Responsibility (Pre-Qualification) Form for all Contracts in excess of $10,000 must be filed in the office of the Village Administrator not later than five (5) calendar days prior to the date of receiving Bids, and shall show sufficient ability, equipment and experience to properly perform the Contract. The Village of Greenville's decision as to qualifications shall be final. WITHDRAWAL OF BIDS No Bid shall be withdrawn for a period of 60-days after the scheduled opening without the consent of the OWNER. GOVERNING LAWS & REGULATIONS The Contract letting shall be subject to the provisions of Sections 66.0901, 66.0903 and 779.16 of the Wisconsin Statutes.

Award

Water / Sewer

$1,557,835.00

Public - City

Site Work

45

17

2

6

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
128
Bidding Soon
1,491
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 28, 2025

Project location map

Multiple Locations, Neenah, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.