BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Brigham City, Utah. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

https://www.hjnews.com/tremonton/tremonton-bothwell-bridge-closure-to-begin-saturday-may-31-i-84-demolition-work-to-take/article_2f90fc8e-7186-49ae-aa10-9496d0482ec3.html The Tremonton Bothwell interchange bridge on SR-102 over I-84 will be closed for construction starting at 6 a.m. on Saturday, May 31, according to the Utah Department of Transportation. The bridge will remain closed at exit 40 through the summer, with an estimated completion date of Aug. 24. The construction consists of a complete bridge deck replacement to ensure safety and longevity of the bridge. "This bridge work will be completed using a single, continuous monolithic pour," UDOT explained, "which minimizes joints and improves long-term strength, durability and construction efficiency." Additionally, I-84 will be facing nightly closures in both directions the first week of June from 10 p.m. to 6 a.m. The closures will be in place June 2-June 6 for "demolition activities," UDOT said, and drivers should "plan for moderate delays." --------------------------------------------------------------------------------------------------- Rehabilitation or Replacement I-84 Bridge Replacements; Blue Creek & Howell I-84; MP 20.17 - 20.38 & I-84; MP 26.44 - 26.62 Route : Mult As of July 22 , 2025, the project is in Conceptual status. Anticipated letting Year is 2027. UTDOT - Bridge Replacements - I-84 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Bridges / Tunnels

$27,500,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
59
Bidding Soon
815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2027

Project location map

I-84, Brigham City, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.