Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 22, 2025 at 8:00 PM
Updated July 23, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Brigham City, Utah. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
https://www.hjnews.com/tremonton/tremonton-bothwell-bridge-closure-to-begin-saturday-may-31-i-84-demolition-work-to-take/article_2f90fc8e-7186-49ae-aa10-9496d0482ec3.html The Tremonton Bothwell interchange bridge on SR-102 over I-84 will be closed for construction starting at 6 a.m. on Saturday, May 31, according to the Utah Department of Transportation. The bridge will remain closed at exit 40 through the summer, with an estimated completion date of Aug. 24. The construction consists of a complete bridge deck replacement to ensure safety and longevity of the bridge. "This bridge work will be completed using a single, continuous monolithic pour," UDOT explained, "which minimizes joints and improves long-term strength, durability and construction efficiency." Additionally, I-84 will be facing nightly closures in both directions the first week of June from 10 p.m. to 6 a.m. The closures will be in place June 2-June 6 for "demolition activities," UDOT said, and drivers should "plan for moderate delays." --------------------------------------------------------------------------------------------------- Rehabilitation or Replacement I-84 Bridge Replacements; Blue Creek & Howell I-84; MP 20.17 - 20.38 & I-84; MP 26.44 - 26.62 Route : Mult As of July 22 , 2025, the project is in Conceptual status. Anticipated letting Year is 2027. UTDOT - Bridge Replacements - I-84 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$27,500,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2027
I-84, Brigham City, UT
Related To This Project
Brigham City, UT
Bid Date: Mar 14 2025
Brigham City, UT
Bid Date: Mar 07 2025
Brigham City, UT
--
Brigham City, UT
Bid Date: Mar 14 2025
Brigham City, UT
Bid Date: Apr 25 2025
Brigham City, UT
Bid Date: Apr 17 2025
Brigham City, UT
Bid Date: May 06 2025
Brigham City, UT
Bid Date: May 28 2025
Brigham City, UT
Bid Date: Mar 26 2025
Brigham City, UT
Bid Date: Feb 20 2025
Brigham City, UT
--
Brigham City, UT
--
Brigham City, UT
--
Brigham City, UT
Bid Date: Jan 21 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
