Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2025 at 7:00 PM
Updated March 12, 2025
Site work for a road / highway in McMinnville, Oregon. Completed plans call for site work for a road / highway.
The Project consists of furnishing all qualified professional personnel, supervision, construction labor, equipment and specified materials including 2"and 3" schedule 40 conduit or polypipe and vaults. Contractor will be responsible to install conduit by primary means of horizontal directional drilling and install power vaults as specified. All Work shall be substantially completed 90 days after issuance of Notice to Proceed to the awarded Contractor. The work is a public works project subject to ORS 279C.800 to 279C.870 or 40 U.S.C. Section 3141, et seq.; prevailing wage rate of pay does apply to this Project. The awarded Contractor is required to have a Public Works Bond on file with the Oregon CCB before work begins. Contractors must be qualified in accordance with the applicable parts of ORS 279C in order to enter into a contract with the Owner for public work in Oregon and shall have a minimum of four years' experience on projects of similar size and complexity to this Work. Mandatory Pre-Bid: Not for this project Bidder Questions Due - March 3, 2025 @ 5:00 pm MW&L Answers to Bidder Questions - March 4, 2025 @ 11:00 am First Tier Subcontractor Disclosure - March 11, 2025 @ 4:00 pm Notice of Intent to Award (tentative) - March 19, 2025 Notice of Award (tentative) - March 27, 2025 Notice to Proceed (tentative) - April 10, 2025 Project Substantial Completion (tentative) - 90 calendar days after Notice to Proceed date Refer Questions to: Chad Hudson Email: cch@mc-power.com Bid Guarantee: Bids must be accompanied by a certified check drawn on a bank in good standing, or a Bid Bond issued by a surety company authorized to issue such bonds in the State of Oregon, in the amount of 10% of the total amount of the Bid submitted. This check or bid bond shall be given as a guarantee that if awarded the contract for construction of the Project, the successful bidder will execute the attached contract and furnish a properly executed Performance and Payment Bond in the full amount of the Contract Price within ten calendar days after the date of the Owner's Notice-of-Award. Any bidder submitting a Bid accepted by the Owner shall file with the Owner, at the time of execution of the contract, a Performance and Payment Bond of the form bound herewith in the full amount of the Contract Price, as security for the faithful performance of the contract and the payment of all persons supplying labor and materials of the construction of the work, and to cover all guarantees against defective workmanship or material, or both, for a period of one (1) year after the date of final acceptance of the work by the Owner, per ORS 279C.380(3) McMinnville Water & Light may reject any Bid not in compliance with the contract provisions and all prescribed Public Contracting procedures and requirements, including the requirement to demonstrate the Bidder's responsibility under ORS 279C.375(3)(b), and may reject for good cause all Bids after finding that doing so is in the public interest. MW&L also reserves the right to waive informalities in a bid submission if in best interest of McMinnville Water & Light.
Post-Bid
Roads / Highways
$30,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
April 10, 2025
NE 17th St, McMinnville, OR
Related To This Project
McMinnville, OR
Bid Date: Mar 26 2025
McMinnville, OR
Bid Date: Mar 25 2025
McMinnville, OR
Bid Date: Mar 27 2025
McMinnville, OR
Bid Date: Apr 30 2025
McMinnville, OR
Bid Date: Apr 30 2025
McMinnville, OR
Bid Date: May 29 2025
McMinnville, OR
Bid Date: May 08 2025
McMinnville, OR
--
McMinnville, OR
Bid Date: Mar 06 2025
McMinnville, OR
Bid Date: Mar 18 2025
McMinnville, OR
Bid Date: Apr 23 2025
McMinnville, OR
--
McMinnville, OR
Bid Date: Feb 11 2025
McMinnville, OR
Bid Date: Jan 28 2025
McMinnville, OR
Bid Date: Jan 15 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.