BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 26, 2025

Site work and paving for a civil project in Pevely, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The project will run the entire length of Old State Rd. North and the entire length of the adjacent connecting street, Charles St. The chosen contractor will be required to mill the butt joints and do selective milling for proper drainage and profiling of smoothness. Mill in front of drive aprons. The City of Pevely is to retain all asphalt mill shaving material. Also, must adjust all Water Meter Boxes and 11 manholes located on either street. Clean and prep. For leveling. Apply tack coat and wedge 350 tons of asphalt for leveling and smoothness then apply a 2" asphalt overlay approximately 940 tons. The contractor chosen will be required to provide traffic control and notify residents of any parking requirements. The chosen contractor must have a valid 2025Contractors License to work inside the Pevely City Limits, must provide proof of insurance, and must have a secure property bond. For any questions concerning this project, please contact Ron Ebmeier, Public Works Supervisor, at 636-346-0831.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
137
Bidding Soon
1,230
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 25, 2025

March 27, 2025

Project location map

Charles St and Old State Hwy N, Pevely, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.