EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 20, 2025 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a bridge / tunnel in Surfside Beach, South Carolina. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Town of Surfside Beach Pedestrian Bridge Each bid must be accompanied by a bid guarantee of not less than FIVE (5%) PERCENT of the base bid. The successful bidder will be required to furnish Performance Bond and Labor & Material Bond, each in the full amount of the contract sum. Refer to other bidding requirements described in Document 00200 - Instructions to Bidders. To be eligible for consideration, bids must comply with the laws of South Carolina, all conditions of the specifications, and must be made on the form provided. The Owner reserves the right to reject any or all bids, waive any informalities and technicalities in bidding and to award the contract in the best interest of the Owner. Bidders shall not be permitted to withdraw bids for a period of sixty (60) days from the opening date. Direct all questions to Bailey Evans at Bolton & Menk, Inc., Myrtle Beach, SC, email Bailey.Evans@bolton-menk.com or by phone at (843) 692-3200. Question Deadline 03/05/2025 at 5:00 PM ET All questions must be submitted in writing to Bailey.Evans@Bolton-Menk.com Bolton & Menk, Inc. agent for the Town of Surfside Beach. Proper reference to this Invitation for Bids is required. All changes in specifications shall be in writing in the form of an addendum and furnished to all bidders. Verbal information obtained otherwise will not be considered in awarding of bids. Project Completion Time: Ninety (90) days. Time for completion will begin when the Notice to Proceed is issued.

Post-Bid

Bridges / Tunnels

$1,000,000.00

Public - City

New Construction, Site Work

5

10

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Timber Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
54
Bidding Soon
598
All Active Projects
264
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 21, 2025

April 21, 2025

img_map_placeholder

To Be Determined, Surfside Beach, SC

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Town of Surfside Beach Pedestrian Bridge

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.