BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2025 at 8:00 PM

Updated March 21, 2025

Demolition, site work, renovation and addition to a museum in Vidalia, Georgia. Conceptual plans call for the addition of a 2,000-square-foot museum; for the demolition of a museum; for the renovation of a museum; and for site work for a museum.

The City of Vidalia is seeking to renovate and build an addition onto the 1935 US Post Office building in downtown Vidalia to become the Vidalia Onion Museum. The existing building is part of our downtown historic district listed on the National Register of Historic Places. It is currently 5,495 sq ft and will need an addition of approximately 2000 sq ft of office space with a demonstration kitchen and deck at the rear. The City of Vidalia is seeking to renovate and build an addition onto the 1935 US Post Office building in downtown Vidalia to become the Vidalia Onion Museum. The existing building is part of our downtown historic district listed on the National Register of Historic Places. It is currently 5,495 sq ft and will need an addition of approximately 2000 sq ft of office space with a demonstration kitchen and deck at the rear. The building is owned by the City of Vidalia and overseen and operated by the Vidalia Convention & Visitors Bureau Authority appointed by the Mayor and City Council of Vidalia. The overall museum layout and exhibit design has been completed by SCADpro.

Conceptual

Museum

$1,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
63
Bidding Soon
544
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

March 16, 2026

Project location map

114 Jackson St, Vidalia, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.