Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 21, 2025 at 8:00 PM
Updated May 22, 2025
Site work, paving and outdoor lighting for a mixed-use development in Telluride, Colorado. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; for paving for a transportation facility; and water / sewer project.
South Side Development Phase 1 DESCRIPTION: The South Side Development Phase 1 project consists of two bid schedules: Base Bid (Schedule I): The major components of the Base Bid portion of the project include: o New airfield pavements south of Runway 9-27 including new Taxiway B3 connector and new parking apron (approx. 5,769 Tons). o Airfield lighting and signage along new Taxiway B3 connector and apron taxilane, and apron reflectors. o New airfield pavement markings (Approx. 2,612 SF). o Significant earthwork (cut and fill), taxiway/taxilane edge drains, and site storm drainage. o Riprap and gabion baskets along the north apron edge Taxilane B. o Relocation of portions of the existing gravel airport service road and perimeter fence. o Salvage and Relocation of the existing Primary Wind Cone and Segmented Circle. Additive Alternate No. 1 (Schedule II): The major components of the Additive Alternate No. 1 includes rough-grading the balance of the ultimate apron site build-out, additional relocation of the service road to the south side of the ultimate project area, a portion of the ultimate buildout storm drainage infrastructure under the relocated service road, and extension of the Taxilane B edge drain to its ultimate point of discharge. ***Prebid notes : The Pre-Bid Meeting and Conference Call can also be attended in person at the Telluride Regional Airport Administration Building, located at 1500 Last Dollar Road, Telluride, CO 81435. A site visit will be provided directly after the pre-bid meeting and conference call. QA 7 March 2025 3PM All communication relative to this solicitation shall be directed in writing (via email) to John Cessar, john.cessar@dibblecorp.com.
Bid Results
Transportation Terminals
$6,423,283.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
June 2, 2025
1500 Last Dollar Rd, Telluride, CO
Related To This Project
Telluride, CO
Bid Date: May 23 2025
Telluride, CO
Bid Date: Oct 07 2025
Telluride, CO
Bid Date: Oct 15 2025
Telluride, CO
Bid Date: Nov 11 2025
Telluride, CO
Bid Date: Nov 28 2025
Telluride, CO
Bid Date: Mar 18 2025
Telluride, CO
Bid Date: Feb 20 2025
Telluride, CO
Bid Date: Feb 11 2025
Telluride, CO
Bid Date: Feb 14 2025
Telluride, CO
Bid Date: Jan 16 2025
Telluride, CO
Bid Date: Feb 14 2025
Telluride, CO
--
Telluride, CO
Bid Date: Feb 04 2022
Telluride, CO
Bid Date: Nov 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
