Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 2, 2025 at 8:00 PM
Updated June 3, 2025
Site work and new construction of a civil project in Moline, Illinois. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
**As of June 2, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The Project includes the following Work: New Influent Pumping Station and Preliminary Treatment Building (Structure 10); new primary clarifier splitter structure (Structure 15); modifications to four existing primary clarifiers (Structure 20); replacement of primary sludge pump (Structure 25); four new biological phosphorus removal aeration tanks (Structure 30), including aeration and mixing equipment and air piping; new Blower and Sludge Pumping Building (Structure 35) housing new aeration blowers, additional primary sludge pumps, fermenter biosolids transfer pumps, and odor control system for the primary sludge fermenter; new mixed liquor splitter structure (Structure 37); two new final clarifiers and modifications to two existing final clarifiers (Structure 40); new ultraviolet (UV) light disinfection structure (Structure 50); excess flow influent channel modifications and gate replacement for the existing excess flow clarifiers (Structure 60); repairs to portions of the existing excess flow basin berms (Structure 65); new primary sludge fermenter (Structure 70); new Biosolids Handling Building housing mechanical thickening and dewatering equipment, sludge pumping, polymer feed equipment, waste activated sludge (WAS) aeration blowers, and plant effluent water system; two new aerated WAS storage tanks (Structure 77); new Chemical Phosphorus Removal Building (Structure 80); modification of the existing Anaerobic Digester Building (Structure 85); new Hauled Waste Receiving Station (Structure 87); new operations building and garage (Structure 90); yard piping, new main switchgear and supervisory control and data acquisition system, replacement of site lighting, underground conduit, and wiring; addition of a new backup power generator; site modifications, including new roadways; and demolition of existing buildings and structures. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of the Bidder's maximum Bid price. OWNER reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. Question Deadline 03/31/2025
Bid Results
Water / Sewer
$113,862,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
2800 48th Ave, Moline, IL
Related To This Project
Moline, IL
Bid Date: Mar 25 2025
Moline, IL
Bid Date: Apr 03 2025
Moline, IL
Bid Date: Mar 19 2025
Moline, IL
Bid Date: Apr 25 2025
Moline, IL
Bid Date: Apr 08 2025
Moline, IL
Bid Date: Apr 22 2025
Moline, IL
Bid Date: Apr 23 2025
Moline, IL
Bid Date: Mar 12 2025
Moline, IL
Bid Date: Apr 15 2025
Moline, IL
Bid Date: Feb 27 2025
Moline, IL
Bid Date: Mar 25 2025
Moline, IL
Bid Date: Mar 14 2025
Moline, IL
Bid Date: Mar 14 2025
Moline, IL
Bid Date: Mar 06 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
