Site work for a water / sewer project in Findlay, Ohio. Completed plans call for site work for a water / sewer project.

This project consists of the replacement of the water main in Morrical Boulevard between Bliss Ave. and the southern right-of-way line of I75. The project will include but not be limited to approximately 1,544 LF of 12-inch C900 waterline, 338 LF of 8-inch C900 waterline, 106 LF of 6-inch C900 waterline, 6-inch and 8-inch connections, two fire hydrants removed/replaced and various fittings. Abandoning of the existing water system, grading & seeding, maintenance of traffic and asphalt pavement repair, as required, are also included. The existing system must remain in service until the system is complete, including serv ice connections by City forces. Rock excavation will be required. Estimated Cost: $657,000 Bidders are advised to pay close attention to the specific details in the Supplemental Specifications and Pay Item Descriptions. Item descriptions detail all that is included with each pay item as well as pay limits for certain items. During construction, maintenance of traffic and access to residences will be major concerns for the City, Contractor, and adjacent property owners. This project is located within the City of Findlay corporation limits and is thereby eligible for City Income Tax collection. The project is funded by a combination of OPWC and City of Findlay local funds. Bidders shall be aware of any required Equal Employment Opportunity requirements as well as the State prevailing wages that apply to this project. Domestic steel use requirements also apply to this project as specified in Section 153.011 of the Ohio Revised Code. A copy of Section 153.011 can be obtained from any office of the Ohio Department of Administrative Services. After the bid date, contracts will be awarded as soon as possible in order to expedite securing materials and beginning construction. Substantial Completion Date: July 25, 2025 Final Completion Date: Aug. 8, 2025 Engineering Estimate: $657,000 Question Deadline: 03/10/2025 at 1:00 PM ET Prospective bidders may address inquiries to Lee Rausch through the Bid Express website

Award

Water / Sewer

$567,630.00

Public - City

Site Work

15

7

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
119
Bidding Soon
1,681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2025

April 14, 2025

Project location map

Multiple Locations, Findlay, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.