BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 21, 2025 at 8:00 PM

Updated March 22, 2025

Site work and paving for a sidewalk / parking lot in Sheboygan, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Pre-Qualification: Yes 15,000 SF remove concrete sidewalk and approaches; 100 SF concrete apron removal; 50 LF remove curb and gutter; 100 SF remove integral sidewalk/curb; 50 CY excessive cut; 50 CY excessive fill , gravel; 15,500 SF, 4-inch concrete sidewalk; 250 SF, 6-inch concrete sidewalk; 50 LF, 30-inch curb and gutter; 100 SF, 7 -inch concrete aprons; 50 LF, 6-inch concrete curb; 200 SF, integral sidewalk and curb; 100 LF concrete sawing; 500 SF grading for new sidewalk; 60 SY 4-inch topsoil, seed, fertilizer; 100 SF, 6-inch concrete sidewalk with panel finish; 10 EA, curb ramp detectable warning fields. Root grinding and removal shall be incidental to the contract. Description: 2025 Sidewalk Program Question Deadline 03/17/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than three days prior to the date for opening of Bids may not be answered.

Bid Results

Sidewalks / Parking Lot

$140,800.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
97
Bidding Soon
940
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2025

April 21, 2025

Project location map

Multiple Locations, Sheboygan, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.