Site work and paving for a sidewalk / parking lot in Saratoga, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sanborn County Park is an approximately 3,500-acre park nestled in the Santa Cruz Mountains between Saratoga and Skyline Boulevard. The project site is located to the south of Sanborn Road within the Core Use Area (CUA) near the main entrance of the Park. The project consists of various trail and accessibility improvements within the CUA. The project will provide improved access around the Core Use Area including reconstructed accessible paths, features, and site furnishings. The new trails will connect to the park's existing trail system and eventually connect to the larger regional trail system planned to come through the Core Use Area in the future. Proposed improvements at Sanborn Park include: New internal park road pedestrian crossings, approximately 1/2-mile of new asphalt pedestrian trails and 1/4-mile of reconstructed asphalt pedestrian trails, fourteen (14) additional vehicular parking stalls, six (6) reconstructed ADA accessible parking stalls with respective ADA signage and pavement markings, and trail connection improvements for the Costanoan and Sequoia staging areas New minor stone retaining walls, new split rail fencing, and two (2) reconstructed wood staircases with handrails Site furnishings including two (2) new accessible picnic areas, BBQs, electrical connections, and two (2) hydration stations New signage including interpretive, trail, ADA, and regulatory signage per the Parks Signage Manual As well as the following items necessary to implement proposed site improvements: Tree pruning, protection, and removals Grading and earthwork The project includes two (2) bid alternates: Natural turf restoration, including gopher wire mesh in select high-use lawn areas, and topdressing and reseeding of the remaining lawn Reconstruction of the Sequoia Petersen Group Picnic Site pavement, installation of new railings, accessibility and drainage improvements Contract duration: 210 days Question Deadline 03/24/2025 at 5:00 PM PT

Bid Results

Sidewalks / Parking Lot

$1,934,300.00

Public - County

Paving, Site Work

73

28

2

4

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Shop-Fabricated Structural Wood, Architectural Woodwork
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Toilet, Bath, and Laundry Accessories, Other Specialties, Scales
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment, Parking Control Equipment, Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Special Structures, Fabricated Engineered Structures, Glazed Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Storm Drainage, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Trenching and Backfilling, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Unit Paving, Precast Concrete Unit Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Irrigation, Planting Irrigation, Drip Irrigation, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Manufacturing Equipment, Machining Equipment, Drilling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
104
Bidding Soon
1,609
All Active Projects
703
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sanborn Park Core Use Area Trails Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.