BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 6, 2025 at 7:00 PM

Updated March 7, 2025

Site work and paving for a mixed-use development in Burlington, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Americans with DisabilitiesAct (ADA) Information The City of Burlington inaccordance with Section504 of the RehabilitationAct (Section 504) and theAmericans with Disabilities Act (ADA), commits tonondiscrimination on thebasis of disability, in all ofits programs and activities.This material can be madeavailable in an alternateformat by emailing BrianDempsey at the City ofBurlington, email briand@burlingtonwa.gov or byphone at 360.755.9715. The City of Burlington,Washington solicits interest from consulting firmswith expertise in roadwaydesign for federally fundedprojects. The City of Burlington, inaccordance with the provisions of Title VI of the Civil Rights Act of 1964 (78Stat. 252,42 U.S.C. 2000dto 2000d-4) and the Regulations, hereby notifies allbidders that will affirmatively ensure that any contract entered into pursuantto this advertisement, disadvantaged business enterprises will be affordedfull and fair opportunity tosubmit bids in response tothis invitation and will notbe discriminated againston the grounds of race,color, or national origin inconsideration for an award. Project Description The work to be performedby the Consultant consistsof preparing engineeringdesign and NEPA environmental permitting forroadway improvementsalong State Route 20 fromAlder Street to CascadeHighway within the City ofBurlington. The project willinstall sidewalks, pedestrian crossings, improvestreet lighting, and add aturn-lane. The main objectives of the project are: . Improve traffic safety andmobility. . Create safe corridor fornonmotorized users. . Provide a safe crossing ofSR20s for pedestrians. The project has a DBEgoal of 16 percent. WSDOT standard agreementfor Negotiated hourly ratesshall be executed and allwork shall be in accordance with WSDOT standard specifications andplans. Additional designrequirements include traffic control devices, pavement design, and ADAsidewalks for nonmotorized safety and accessibility. Evaluation Criteria Submittal will be evaluated and ranked based onthe following criteria andscoring percentages: 1. Qualifications of theProposed Project Manager (20%) 2. Qualifications/Expertiseof Firms (PE, RW, and CM)(20%) 3. Ability to meet schedule(15%) 4. Approach to project(15%) 5. Past performance references (PE, RW, and CM)(10%) 6. Familiarity with WSDOT/FHWA standards (10%) 7. Approach to meet theDBE goal (DBE Participation Plan) (10%) Estimated ProcurementSchedule Advertise RFQ February28, 2025 Receive RFQ March 21,2025 Consultant Selection Interviews April 4, 2025 Consultant SelectionAward April 11, 2025 Scoping and ContractAward April 24, 2025 Begin Work June 1, 2025 Complete Work December15, 2026 EEO All consultants will be heldto meet Federal Equal Employment Opportunity requirements. Submittal Submittals should includethe following information:Firm name, phone andemail contact, and nameof Principle-in-Charge andProject Manager. Work to be performed bythe Consultant consists ofdeveloping the concept,plans, specifications andbid package for the construction contract. Theproject will require coordination with WSDOT, aswell as additional designservices such as drainageand lighting. The City reserves the right to retainthe services of the successful firm for ROW, andconstruction managementservices. Federal fundinghas been secured for design and right of way services at this time. Workshall start this Spring andcontinue through all of2026.

Conceptual

Roads / Highways

$570,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
348
Active Projects
139
Bidding Soon
2,192
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

State Rte 20, Burlington, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.