BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Renovation of an educational facility in Sparks, Nevada. Completed plans call for the renovation of a educational facility.

New air-conditioning system school-wide including new mechanical building and equipment enclosure. New equipment includes but is not limited to; Chiller, pumps, plumbing, unit ventilators, package units, electrical and other associated work. Additional work includes demolition and building repairs of existing systems including but not limited to; Classroom unit ventilators, roof top evaporative coolers, evaporative cooler penthouses, roof top package units, curbs, selective roof demolition, associated ductwork, plumbing, and electrical, and other associated work. All questions shall be submitted in writing directly to WCSDs Solicitations website at http://solicitations.washoeschools.net/ or via e-mail to solicitations@washoeschools.net by 4:30 p.m. (Local Time) on June 11, 2025 Each individual bid shall be accompanied by a surety company issued Bid Bond or by a Certified or Cashiers Check made payable to the Washoe County School District, in the amount of not less than five percent (5%) of the bid, said amount to be forfeited to WCSD, should the Contractor to whom the Contract is awarded fail to enter into the Contract in accordance with the Contractor's bid and any other contract documents and furnish the required bonds within ten (10) days after the delivery of notice of such award. Bid Bonds, upon request, or deposits of the unsuccessful bidders will be returned upon signing of Contract, or within forty-five (45) days from bid date, whichever is earlier. Contractor must agree that Owner may retain from the monies due the Contractor Two Thousand Five Hundred Dollars ($2,500) per day (Liquidated Damages) as a direct result of the Contractor's delay or for not completing the project in the required time allowance plus approved time extensions. The right is reserved by WCSD to reject any and all bids or accept the bid, which is deemed by WCSD to be in the best interest of the school district. WCSD also reserves the right to waive any irregularities and/or informalities in the submitted bids. Work shall be completed on or before August 1, 2026. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Low$3,240,000.00-High$3,960,000.00 JL#68165 FCIS #186-ME-0020/0019/0011/0004/0037/0032/0028 Award of Project Date Following the required protest period, WCSD expects to Award the Contract for this Project at the Board of Trustees meeting on July 29, 2025.

Award

Educational

$4,257,616.00

Public - County

Renovation

59

20

2

8

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
19
Bidding Soon
350
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2025

July 21, 2025

Project location map

3570 Waterfall Dr, Sparks, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.