BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Site work and paving for a mixed-use development in Kensington, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

General work description: The work to be done generally consists of placing two types of surface treatments on various roads in Kensington area: a type II fiberized slurry seal, or cold plane and overlay with hot mix asphalt (HMA), Including Clark Road in El Sobrante. Work will involve surface preparation, including weed spray, crack sealing, pavement failure repair, edge grinding, removal of existing thermoplastic stripes and pavement markings, removal of existing curb and sidewalk, and placing concrete curb ramps in compliance with the American with Disabilities Act, setting survey monuments, and placement of thermoplastic striping and pavement markings. The Contractor must possess a valid Class A or Class C-12 License at the time the Contract is awarded. Question Deadline 04/03/2025 at 12:00 PM PT For questions regarding the project contact Henry Hussey, Design/Construction Division, at 925.313.2338; email: henry.hussey@pw.cccounty.us Number of Working Days: 75 Bids must cover the entire project, and neither partial nor contingent bids will be considered. The successful bidder must furnish a payment bond and a performance bond. Liquidated damages for all work except plant establishment are as shown in the following table: Liquidated damages Total bid Liquidated damages From over To per day $0 $200,000 $2,800 $200,000 $500,000 $3,600 $500,000 $1,000,000 $3,600 $1,000,000 $2,000,000 $4,200 $2,000,000 $5,000,000 $5,200 $5,000,000 $10,000,000 $6,700 $10,000,000 $20,000,000 $9,500 $20,000,000 $50,000,000 $13,200 $50,000,000 $100,000,000 $16,000 $100,000,000 $250,000,000 $19,300 The said Board reserves the right to reject any and all bids or any portion of any bid and/or waive any irregularity in any bid received. Document Note: The Public Works Department does not guarantee the arrival of the plans and specifications in time for bidding. For more information about obtaining plans and specifications by mail, please call Blueprint Express at (707) 745- 3593. You may obtain electronic PDF copies of the plans and specifications upon purchase of the bid package through the Online for no additional service charge. General work description: The work to be done generally consists of placing two types of surface treatments on various roads in Kensington area: a type II fiberized slurry seal, or cold plane and overlay with hot mix asphalt (HMA), and cold plane and overlay on Clark Road in El Sobrante. Work will involve surface preparation, including weed spray, crack sealing, pavement failure repair, edge grinding, removal of existing thermoplastic stripes and pavement markings, removal of existing curb and sidewalk, and placing concrete curb ramps in compliance with the American with Disabilities Act, setting survey monuments, and placement of thermoplastic striping and pavement markings.

Bid Results

Roads / Highways

$2,764,589.00

Public - County

Paving, Site Work

10

2

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
12
Bidding Soon
1,697
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

June 9, 2025

Project location map

Multiple Locations, Kensington, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.