BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work for a civil project in Lake Buena Vista, Florida. Completed plans call for site work for a road / highway; and water / sewer project.

Online Q&A Yes Q&A Deadline 03/25/2025 6:00 PM (EDT) The scope of work for the S-405 Control Structure Repairs Project includes, but is not limited to: temporary traffic control (TTC), erosion and turbidity control, dewatering, stop log and cofferdam installation, stop log storage frame construction, removal and replacement of the amil gate and repair of existing water control structure. DESCRIPTION: The Project is briefly described as follows: The S-405 Water Control Structure Repairs Project includes: Work that can take place during the wet season (approximately June 1st through November 1st): (i) preparing and installing an approved erosion and turbidity control plan; (ii) preparing dewatering pumping plan; (iii) measuring for new frame and amil gate; (iv) installing new frame and measuring for stop logs and screens; (v) ordering and installing stop logs and cofferdam system; (vi) testing new stop log and cofferdam system; (vii) building stop log/screen storage frame for use in storing stop logs/screens nearby when not in use. (viii) Perform embankment shore repairs upstream and Rip Rap and shore repairs downstream of water control structure (See in Supplemental Attachment SA-08). (ix) Remove and replace all joint material within the concrete flumes both upstream and downstream of the structure and seal any cracks. Approximate Lengths: Upstream = 82.6' , Downstream = 91.2'. A flexible epoxy joint sealer that is approved on the FDOT APL list. Work that shall take place during the dry season (approximately November 1st through June 1st): (x) setting up approved dewatering pumping bypass plan (xi) installing stop logs (xii) Replacing the existing amil gate (automatic water control structure) and repairing all damage to the water control structure S-405, as indicated in the plans and specifications. (xiii) Balance gate in coordination with CFTOD staff and verify final balance with Waterman. Counter-balance weight may vary. For bidding purposes assume 34,700 lbs. of steel rebar. (xiv) Remove bypass, remove stop logs and install trash screens.

Bid Results

Roads / Highways

$2,237,700.00

Public - County

Site Work

19

30

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
99
Bidding Soon
2,969
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

April 25, 2025

Project location map

Multiple Locations, Lake Buena Vista, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.