BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 2, 2025 at 8:00 PM

Updated April 3, 2025

Site work for a road / highway in Urbandale, Iowa. Completed plans call for site work for a road / highway.

General Nature of Public Improvement The MEREDITH DRIVE FIBER CONNECTION shall include: Approximately 3,900 LF of Boring 2" Conduit Approximately 4,500 LF of 36 SM Fiber Cable Related items including removals, restoration, traffic control, erosion control, and survey. Estimate: $106,000 If you have any questions or need further information, please call 515-278-3950. You may sign up for notifications of future bid postings at our website at online. Time for Commencement and Completion of Work. Work on the improvement shall be commenced immediately upon approval of the contract by the Council, and be completed as stated below. Contractor shall fully complete the project by August 29, 2025. The successful bidder will be required to furnish Performance Bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City, from claims and damages of any kind caused by the operation of the Contractor. Payment of the cost of said project will be made from any one or a combination of the following sources at the discretion of the Council: Cash from such funds as may be legally used for said purpose. Payments will be made to the Contractor based on monthly estimates in amounts equal to ninetyfive percent (95%) of the contract value of the work completed, and will be based upon an estimate prepared on the first day of each month by the Contractor, subject to verification by City Engineer and the approval of the Clerk, who will certify to the Owner for payment of each approved estimate on or before the 10th day of the month in question. Such monthly payment will in no way be construed as an act of acceptance for any part of the work partially or totally completed. The balance of the five percent (5%) due the Contractor will be paid, subject to the conditions and in accordance with the provisions of Chapters 26 and 573 of the Code of Iowa, as amended. No partial or final payment will be due until the Contractor has certified to Owner, that the materials, labor and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications.

Award

Roads / Highways

$66,972.00

Public - City

Site Work

13

6

2

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
100
Bidding Soon
1,119
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.