Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work and new construction of a military facility in Comox, British Columbia. Completed plans call for the construction of a military facility; and for site work for a military facility.

Reference Number 0000288554 1.4.1 Currently, a Statement of Operational Requirements (Infrastructure) (SOR-I) exists but no solution has been examined to meet these requirements. Only a Rough Order Magnitude estimate has been completed, which is based on the estimated space requirements provided in the SOR-I. 1.4.2 The required Services will have to proceed in different phases. Furthermore, the funding for this Project will also be received in different stages. Below are the high-level anticipated phases of the Project: 1 Contract Award Scope of Services: Work Package 1 - Design and Project Management for the pre-design, concept design, design development, construction documents, and fixed price negotiation for the new aircraft maintenance hangar. Refer to the SOW for more information. 2 Work Package 2: Design new infrastructure for displaced units including demolition design of existing infrastructure. Refer to the SOW for more information. 3 Work Package 3: Design of Mobile Tactical Operations Centre/Tactical Operations Centre (MTOC/TOC). Refer to the SOW for more information. 4 Work Package 4: Design demolition plan for Hangar 7. Refer to the SOW for more information. .5 Construction Phase 1: Work Package 5 - includes the construction, commissioning, certification and post-construction phase services of the new displaced unity infrastructure. Refer to the SOW for more information. .6 Construction Phase 2: Work Package 6 - includes the construction, commissioning, certification and post-construction phase services of the new aircraft maintenance hangar. Refer to the SOW for more information. 7 Construction Phase 3: Work Package 7 - includes the construction, commissioning, certification and post-construction phase services of the MTOC/TOC infrastructure. Refer to the SOW for more information. .8 Construction Phase 4: Work Package 8 - includes the demolition of Hangar 7. Refer to the SOW for more information. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Military

$253,400,000.00

Public - Federal

New Construction, Site Work

1

9

38

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
19
Bidding Soon
284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2025

August 19, 2025

Project location map

19 Wing Comox, Comox, BC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed