Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 11, 2025 at 8:00 PM
Updated March 12, 2025
Site work and paving for a road / highway in Prattville, Alabama. Working plans call for site work for a road / highway; and for paving for a road / highway.
Access Management Along SR-3 (US-31) From Murfee Drive to CR-75 (Mcqueen Smith Road) and Installation of Green-t Signal at the Intersection of SR-3 (US-31) and CR-75 (Mcqueen Smith Road) Type of Work : Safety improvements Project Length in Miles 0.530 County: Autauga As of March 11, 2025, the project is in Final Planning status. Anticipated Construction year is 2025. ALDOT - Access Management Along SR-3 (US-31) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Final Planning
Roads / Highways
$752,000.00
Public - State/Provincial
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
US-31 & McQueen Smith Rd S, Prattville, AL
Related To This Project
Prattville, AL
--
Prattville, AL
--
Prattville, AL
Bid Date: Apr 10 2025
Prattville, AL
Bid Date: Apr 16 2025
Prattville, AL
--
Prattville, AL
Bid Date: Apr 24 2025
Prattville, AL
--
Prattville, AL
--
Prattville, AL
--
Prattville, AL
--
Prattville, AL
Bid Date: Mar 13 2025
Prattville, AL
Bid Date: Mar 11 2025
Prattville, AL
Bid Date: Feb 28 2025
Prattville, AL
Bid Date: Mar 06 2025
Prattville, AL
Bid Date: Feb 27 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
