Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 12, 2025 at 8:00 PM
Updated October 1, 2024
Outdoor lighting and renovation of a road / highway in Berkeley, California. Completed plans call civil work for a road / highway.
Question Deadline 03/27/2025 at 2:00 PM PT Questions concerning the anticipated work or scope of the project should be directed to Jesse Peoples, Project Manager, via email at jpeoples@berkeleyca.gov, no later . Questions received after this time may not be answered Approximately 1.2 miles of bicycle boulevard improvements along Fulton St, Prince St, Wheeler St, and Woolsey Street. Crossing improvements at five key intersections; and Bus stop relocations and upgrades. More specifically, the Work consists of but is not limited to, coordination with utility companies, AC Transit, BART, and nearby businesses and residents; saw-cutting; removal of existing pavement markings and raised pavement markers; removal of existing asphalt concrete pavements; removal of Portland cement concrete curbs, gutters, and sidewalks; construction of new Portland cement concrete sidewalks, curb ramps, medians, and bus stop pads; installation of asphalt concrete pavement and speed tables; installation of new bus stop shelters and benches; adjusting utility boxes and covers to grade; installation of pavement striping and markings; installation of curb paint; installation of signage; installation of traffic circle; installation of pedestrian hybrid beacons (PHBs); and installation of solar-powered Rectangular Rapid Flashing Beacons (RRFBs) and lighting. The work includes preparation and submittal of a Construction Phasing Plan, as well as Traffic Control Plans for each phase of work. The Contractor is responsible to obtain and comply with all necessary permits and approvals to perform the work. The Contractor is also responsible for coordinating its work with other upcoming and ongoing projects, operations, and maintenance activities by others. Location: The location of the Work is described in these Specifications and shown in the Plans. In general, the Work of this project is at the following locations: Fulton Street (Dwight Way to Prince Street) Prince Street (Wheeler Street to Fulton Street) Wheeler Street (Prince Street to Woolsey Street) Woolsey Street (Adeline Street to Wheeler Street) The intersections of: Martin Luther King Jr Way and Prince Street Adeline Street & Woolsey Street Shattuck Avenue & Woolsey Street Wheeler Street & Prince Street Shattuck Avenue & Ashby Avenue Shattuck Avenue & Russell Street Adeline Street & Russell Street
GC Bidding
Roads / Highways
$4,227,000.00
Public - City
Outdoor Lighting, Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
June 2, 2025

Multiple Locations, Berkeley, CA
Related To This Project
Berkeley, CA
Bid Date: Mar 20 2025
Berkeley, CA
Bid Date: Apr 03 2025
Berkeley, CA
--
Berkeley, CA
Bid Date: Mar 27 2025
Berkeley, CA
Bid Date: Apr 08 2025
Berkeley, CA
Bid Date: Mar 25 2025
Berkeley, CA
Bid Date: Jul 19 2021
Berkeley, CA
--
Berkeley, CA
Bid Date: Mar 20 2025
Berkeley, CA
Bid Date: Mar 13 2025
Berkeley, CA
Bid Date: Mar 12 2025
Berkeley, CA
Bid Date: Mar 04 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.