EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 12, 2025 at 8:00 PM

Updated October 1, 2024

Outdoor lighting and renovation of a road / highway in Berkeley, California. Completed plans call civil work for a road / highway.

Question Deadline 03/27/2025 at 2:00 PM PT Questions concerning the anticipated work or scope of the project should be directed to Jesse Peoples, Project Manager, via email at jpeoples@berkeleyca.gov, no later . Questions received after this time may not be answered Approximately 1.2 miles of bicycle boulevard improvements along Fulton St, Prince St, Wheeler St, and Woolsey Street. Crossing improvements at five key intersections; and Bus stop relocations and upgrades. More specifically, the Work consists of but is not limited to, coordination with utility companies, AC Transit, BART, and nearby businesses and residents; saw-cutting; removal of existing pavement markings and raised pavement markers; removal of existing asphalt concrete pavements; removal of Portland cement concrete curbs, gutters, and sidewalks; construction of new Portland cement concrete sidewalks, curb ramps, medians, and bus stop pads; installation of asphalt concrete pavement and speed tables; installation of new bus stop shelters and benches; adjusting utility boxes and covers to grade; installation of pavement striping and markings; installation of curb paint; installation of signage; installation of traffic circle; installation of pedestrian hybrid beacons (PHBs); and installation of solar-powered Rectangular Rapid Flashing Beacons (RRFBs) and lighting. The work includes preparation and submittal of a Construction Phasing Plan, as well as Traffic Control Plans for each phase of work. The Contractor is responsible to obtain and comply with all necessary permits and approvals to perform the work. The Contractor is also responsible for coordinating its work with other upcoming and ongoing projects, operations, and maintenance activities by others. Location: The location of the Work is described in these Specifications and shown in the Plans. In general, the Work of this project is at the following locations: Fulton Street (Dwight Way to Prince Street) Prince Street (Wheeler Street to Fulton Street) Wheeler Street (Prince Street to Woolsey Street) Woolsey Street (Adeline Street to Wheeler Street) The intersections of: Martin Luther King Jr Way and Prince Street Adeline Street & Woolsey Street Shattuck Avenue & Woolsey Street Wheeler Street & Prince Street Shattuck Avenue & Ashby Avenue Shattuck Avenue & Russell Street Adeline Street & Russell Street

GC Bidding

Roads / Highways

$4,227,000.00

Public - City

Outdoor Lighting, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
116
Bidding Soon
1,963
All Active Projects
945
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

June 2, 2025

img_map_placeholder

Multiple Locations, Berkeley, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

South Berkeley Bikeway and Bus Stop Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.